IMPROVEMENT OF SURVEYING PROCEDURE FOR CHANGING RETARDING SITUATION OF GEOLOGIC WORKS

Zhou Baoxi

Journal of Railway Engineering Society ›› 1995, Vol. 12 ›› Issue (4) : 29-34.

PDF(449 KB)
PDF(449 KB)
Journal of Railway Engineering Society ›› 1995, Vol. 12 ›› Issue (4) : 29-34.

IMPROVEMENT OF SURVEYING PROCEDURE FOR CHANGING RETARDING SITUATION OF GEOLOGIC WORKS

  • Zhou Baoxi
Author information +
History +

Abstract

The paper points out the passive retarding situation of the railway geologic works and its creating reasons. Being aimed at passive situation of the geologic works, in order to change this passive retarding situation, several measures are suggested in this paper, such as inv- proving the surveying procedure, proceeding necessary reformation to the contents and depth of the geologic works in the preliminary surveying, and strengthening the geologic synthetical prospecting works* etc.

Key words

surveying procedure / geologic work

Cite this article

Download Citations
Zhou Baoxi. IMPROVEMENT OF SURVEYING PROCEDURE FOR CHANGING RETARDING SITUATION OF GEOLOGIC WORKS[J]. Journal of Railway Engineering Society, 1995, 12(4): 29-34
PDF(449 KB)

2617

Accesses

0

Citation

Detail

Sections
Recommended

/