STUDY ON CONSTRUCTION METHODS OF RAILWAY PRESTRESSED CONCRETE BRIDGES

Jia Zhiwu

Journal of Railway Engineering Society ›› 1996, Vol. 13 ›› Issue (4) : 26-30.

PDF(140 KB)
PDF(140 KB)
Journal of Railway Engineering Society ›› 1996, Vol. 13 ›› Issue (4) : 26-30.

STUDY ON CONSTRUCTION METHODS OF RAILWAY PRESTRESSED CONCRETE BRIDGES

  • Jia Zhiwu
Author information +
History +

Abstract

The paper introduces tho ro ughly the principal co nst ructio n methods of the prest ressed co ncrete beams in our country , as w ell as thei r applications and developments in the construction o f Chinese rai lway bridges. Based on the analy ses a nd the comparisons, the important applying sco pes of these co nst ructio n methods are pointed o ut.

Key words

prest ressed co ncrete beam / construction method

Cite this article

Download Citations
Jia Zhiwu. STUDY ON CONSTRUCTION METHODS OF RAILWAY PRESTRESSED CONCRETE BRIDGES[J]. Journal of Railway Engineering Society, 1996, 13(4): 26-30
PDF(140 KB)

2737

Accesses

0

Citation

Detail

Sections
Recommended

/