ANALYSES  ON CAUSE OF FORMATION FOR FAULTED LARGE-DIAMETER LONG CAST-IN-PLACE CONCRETE PILES AND THEIR PREVENTIVE AND REINFORCING TREATMENTS

Wa ng Wuqin

Journal of Railway Engineering Society ›› 1997, Vol. 14 ›› Issue (2) : 49-55.

PDF(190 KB)
PDF(190 KB)
Journal of Railway Engineering Society ›› 1997, Vol. 14 ›› Issue (2) : 49-55.

ANALYSES  ON CAUSE OF FORMATION FOR FAULTED LARGE-DIAMETER LONG CAST-IN-PLACE CONCRETE PILES AND THEIR PREVENTIVE AND REINFORCING TREATMENTS

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 1997, 14(2): 49-55

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(190 KB)

Accesses

Citation

Detail

Sections
Recommended

/