THE MOST DIFFICULT CONSTRUCTION METHOD OF TUNNEL WITH MUDSTONE

Wu Chengsan

Journal of Railway Engineering Society ›› 1998, Vol. 15 ›› Issue (2) : 57-60.

PDF(139 KB)
PDF(139 KB)
Journal of Railway Engineering Society ›› 1998, Vol. 15 ›› Issue (2) : 57-60.

THE MOST DIFFICULT CONSTRUCTION METHOD OF TUNNEL WITH MUDSTONE

  • Wu Chengsan
Author information +
History +

Abstract

Due to the w eak surrounding rock, hig h g round stress. easy co llapse and big deforma tion, the co nst ructio n of tunnel s wi th mudsto ne w ere v ery dif ficul t. the pa per int roduces the foreig n ex perience fo r co nst ructing thi s kind of tunnel. Combined wi th the practices in home, the autho r pro poses a lso several sugg estio ns concerned wi th using the multisection tunnel ling method, st reng thening the suppor ts, sha ping the circular sectio n and determining th e g ro und st ress, etc.

Key words

mudstone / g round st ress / funnel ling method / suppo rts / shaping the ci rcula r section

Cite this article

Download Citations
Wu Chengsan. THE MOST DIFFICULT CONSTRUCTION METHOD OF TUNNEL WITH MUDSTONE[J]. Journal of Railway Engineering Society, 1998, 15(2): 57-60

References

1 Ha rtmut Wesemuller. Dkr Eg glltumel. Der Euen bah n mg eniur. 1997 2 吴成三,王梦恕. 软岩隧道的修建方法. 世界隧道. 1997, 3 3 Leo po ld miiller. De r Felsba ll Dritte r Dand Tunmelbau. 1978 4 蒋中庸. 狗磨弯隧道,浅埋偏压三线段施工技术. 八届隧道年会论文集. 1994, 10 5 冯卫星,张国华,梁洪彪. 京九线岐岭隧道进洞施工设计. 八届隧道年会论文集. 1994, 10
PDF(139 KB)

2581

Accesses

0

Citation

Detail

Sections
Recommended

/