SEVERAL TECHNICAL PROBLEMS ABOUT RAILWAY CONCRETE-FILLED STEEL TUBULAR ARCH BRIDGE

PENG Yue-shen

Journal of Railway Engineering Society ›› 2000, Vol. 17 ›› Issue (2) : 35-39.

PDF(161 KB)
PDF(161 KB)
Journal of Railway Engineering Society ›› 2000, Vol. 17 ›› Issue (2) : 35-39.

SEVERAL TECHNICAL PROBLEMS ABOUT RAILWAY CONCRETE-FILLED STEEL TUBULAR ARCH BRIDGE

  • PENG Yue-shen
Author information +
History +

Abstract

According to the fea tures of railw ay bridg e, sev eral impo rta nt technical pro blems must be solved during th e co nst ructio n o f co ncrete-filled steel tubular arch bridge, such as: the applica tio n o f standards, the main stuctural detail s, fatig ue desig n a nd w elding , etc.

Key words

railw ay bridg e / concrete-filled steel tubula r arch bridge / standard / fa tig ue / welding

Cite this article

Download Citations
PENG Yue-shen. SEVERAL TECHNICAL PROBLEMS ABOUT RAILWAY CONCRETE-FILLED STEEL TUBULAR ARCH BRIDGE[J]. Journal of Railway Engineering Society, 2000, 17(2): 35-39

References

[ 1] 陈宝春.钢管混凝土拱桥设计与施工[M ].北京: 人民交通出版社, 1999. 
[ 2] 范文理.空心管结构及连接的静力设计[ A].成都: 四川省公路学会桥梁学术讨论会论文集[ C]. 1998. 
[ 3 ] 汤羽.大型管状结构十字型接头的应力分析及加强措施探讨[ J].北京: 石油学报, 1985, 6( 4) .
[ 4] 汤国栋,等.集束钢管混凝土提篮拱桥研究进展[ A].上海: 13届全国桥梁学术会议论文集[ C]. 1998. 
[ 5] 张联燕,等.钢管混凝土空间桁架组合梁式结构[M ].北京: 人民交通出版社, 1999. 
[ 6 ] 美国国家标准( AN SI /AW SD1. 1) ,钢结构焊接规范[ S]. 1985.
PDF(161 KB)

2711

Accesses

0

Citation

Detail

Sections
Recommended

/