FEASIBLE PROBINGON NEW METHOD OF DISPLACEMENT MONITOR OF TUNNEL

XU Wan-peng

Journal of Railway Engineering Society ›› 2000, Vol. 17 ›› Issue (2) : 65-68.

PDF(126 KB)
PDF(126 KB)
Journal of Railway Engineering Society ›› 2000, Vol. 17 ›› Issue (2) : 65-68.

FEASIBLE PROBINGON NEW METHOD OF DISPLACEMENT MONITOR OF TUNNEL

  • XU Wan-peng
Author information +
History +

Abstract

In this paper, according to the trait of displacement monitor of N ATM and combined with the develop of modern instrument of measure,two new methods of diplacement monitor of tunnel are put forward “ the system of three—iimensional displacement monitor” and “ the arbitrary point system of peripheral convergence of tunnel”. The former, at one point, can provide the dependable informations of three— dimensional deformation for several sections of inspect in a short time. The latter, can provide the accurate informations of peripheral convergence of tunnel for several sections of inspect,and its working efficency can be improved distinctly than the conventional method.

Key words

N ATM / displacement monitor / three-dimensional deformation

Cite this article

Download Citations
XU Wan-peng. FEASIBLE PROBINGON NEW METHOD OF DISPLACEMENT MONITOR OF TUNNEL[J]. Journal of Railway Engineering Society, 2000, 17(2): 65-68

References

[1]王建宇.隧道工程监测和信息化设计原理[M].中国铁道出版社.17~ 56. 
[2]于来法,段定乾.实时经纬仪工业测量系统[M].测绘出 版社.25~ 32. 
[3]陈永奇,吴子安,吴中如.变形监测分析与预报[M].测绘出版社.
PDF(126 KB)

2887

Accesses

0

Citation

Detail

Sections
Recommended

/