CONTROL BLASTING TECHNIQUE FOR AN URBAN LARGE- SPAN SHALLOW UNDERGROUND CAVERN

LIU Kun-peng,GUAN Ze-ying

Journal of Railway Engineering Society ›› 2000, Vol. 17 ›› Issue (2) : 96-100.

PDF(173 KB)
PDF(173 KB)
Journal of Railway Engineering Society ›› 2000, Vol. 17 ›› Issue (2) : 96-100.

CONTROL BLASTING TECHNIQUE FOR AN URBAN LARGE- SPAN SHALLOW UNDERGROUND CAVERN

  • LIU Kun-peng,GUAN Ze-ying
Author information +
History +

Abstract

The Yushan Skating Rink Project was situated at the bottom of Yushan Hill in a city s central busy region- It was a large-span shallow underground cavern- The surrounding environment of this project was complex with specialities of high technical requirements and big constructing difficulties. Therefore,during the construction procedure by drilling and blasting method,the control blasting technique must be employed, not only for decreasing the influence of blasting vibration on the surrounding buildings, but also for controlling the distance of flying rocks and for lowering the blasting noise. The applications of the control blasting technique in the Yushan Skating Rink Project are expounded in detail in this paper.

Key words

large-span / shallow underground cavern / control blasting

Cite this article

Download Citations
LIU Kun-peng, GUAN Ze-ying. CONTROL BLASTING TECHNIQUE FOR AN URBAN LARGE- SPAN SHALLOW UNDERGROUND CAVERN[J]. Journal of Railway Engineering Society, 2000, 17(2): 96-100

References

[1]隧道爆破现代技术[M].中国铁道出版社,1995. 
[2]铁路工程爆破安全规则[M].中国铁道出版社,1986 
[3]隧道施工技术规范[S].中国铁道出版社,1995. 
[4]朱传统,梅锦煜.爆破安全与防护[M ].水电、电力出版社. 
[5]陈应汀.于山博物馆地下爆破影响观测报告[R].
PDF(173 KB)

2597

Accesses

0

Citation

Detail

Sections
Recommended

/