MAIN ENGINEERING GEOLOGY PROBLEMS CONTROLLING SCHEME SELECTION OF ZHICHENG-WANZHOU RAILWAY LINE AND ITS ROUTE SELECTION

DENG Yi-ming

Journal of Railway Engineering Society ›› 2001, Vol. 18 ›› Issue (2) : 59-66.

PDF(247 KB)
PDF(247 KB)
Journal of Railway Engineering Society ›› 2001, Vol. 18 ›› Issue (2) : 59-66.

MAIN ENGINEERING GEOLOGY PROBLEMS CONTROLLING SCHEME SELECTION OF ZHICHENG-WANZHOU RAILWAY LINE AND ITS ROUTE SELECTION

  • DENG Yi-ming
Author information +
History +

Abstract

Under the complex geological situations of the Zhicheng-Wanzhou railway line, seizing the key major geology problems, the special characteristics of these problems and their controlling roles are analyzed. The principles of engineering geologic route selection are proposed, and the large-area scheme comparisons are put forward, which has reflected fully the importance of the engineering geologic route selection.

Key words

Zhicheng-Wanzhou Railway / major geology problem / geologic route selection

Cite this article

Download Citations
DENG Yi-ming. MAIN ENGINEERING GEOLOGY PROBLEMS CONTROLLING SCHEME SELECTION OF ZHICHENG-WANZHOU RAILWAY LINE AND ITS ROUTE SELECTION[J]. Journal of Railway Engineering Society, 2001, 18(2): 59-66
PDF(247 KB)

2743

Accesses

0

Citation

Detail

Sections
Recommended

/