RAILWAY ENGINEERING GEOLOGY ROUTE SELECTION IN MULTIYEAR FROZEN EARTH REGION

ZHOU Hu-li

Journal of Railway Engineering Society ›› 2001, Vol. 18 ›› Issue (4) : 112-115.

PDF(160 KB)
PDF(160 KB)
Journal of Railway Engineering Society ›› 2001, Vol. 18 ›› Issue (4) : 112-115.

RAILWAY ENGINEERING GEOLOGY ROUTE SELECTION IN MULTIYEAR FROZEN EARTH REGION

  • ZHOU Hu-li
Author information +
History +

Abstract

Based on the analysis of geologic characteristics and unfavorable geology in the multiyear frozen region, combined with the disaster in the zone with multiyear frozen earth along the Qing-Zang Railway and Qing-Zang Highway, the paper discusses the railway engineering geology route selection and the engineering measures in multiyear frozen earth region.

Key words

multiyear frozen earth / railway / engineering geology route selection

Cite this article

Download Citations
ZHOU Hu-li. RAILWAY ENGINEERING GEOLOGY ROUTE SELECTION IN MULTIYEAR FROZEN EARTH REGION[J]. Journal of Railway Engineering Society, 2001, 18(4): 112-115

References

[1]铁科院西北研究所.中科院兰州冰川研究所.青藏高原多年冻土地区铁路修筑的研究[R].1991.
[2]国家标准.冻土地区工程地质勘察规范[S].1995.
[3]段秀石,毛济周.青藏公路的冻土与病害问题[R].1998.
PDF(160 KB)

Accesses

Citation

Detail

Sections
Recommended

/