CALCULATING TECHNIQUE ON DIFFERENCE OF COST OF MATERIALS IN BUDGETARY ESTIMATE OF DESIGN FOR XI’AN-ANKANG RAILWAY

FENG Yun-ping, HUANG Jin-chang

Journal of Railway Engineering Society ›› 2001, Vol. 18 ›› Issue (4) : 135-136.

PDF(98 KB)
PDF(98 KB)
Journal of Railway Engineering Society ›› 2001, Vol. 18 ›› Issue (4) : 135-136.

CALCULATING TECHNIQUE ON DIFFERENCE OF COST OF MATERIALS IN BUDGETARY ESTIMATE OF DESIGN FOR XI’AN-ANKANG RAILWAY

  • FENG Yun-ping1, HUANG Jin-chang2
Author information +
History +

Abstract

In the budgetary estimate of design for the Xi'an-Ankang Railway, when the contradictory appeared during the implementation of the relative policy stipulations, the adopted technique and its consideration for calculating the difference of the cost of the materials are introduced in this paper. Furthermore, the thinking and conception induced by the questions are proposed. It is emphasized that we should combine with practical situations and control & apply flexibly the relative methods and stipulations.

Key words

Xi'an-Ankang Railway / difference in cost of materials / calculation

Cite this article

Download Citations
FENG Yun-ping, HUANG Jin-chang. CALCULATING TECHNIQUE ON DIFFERENCE OF COST OF MATERIALS IN BUDGETARY ESTIMATE OF DESIGN FOR XI’AN-ANKANG RAILWAY[J]. Journal of Railway Engineering Society, 2001, 18(4): 135-136
PDF(98 KB)

Accesses

Citation

Detail

Sections
Recommended

/