Preliminary talking about tender be selected with lower quoted price during calling tenders and bidding for project

Dong ding-yan

Journal of Railway Engineering Society ›› 2002, Vol. 19 ›› Issue (1) : 127-129.

PDF(124 KB)
PDF(124 KB)
Journal of Railway Engineering Society ›› 2002, Vol. 19 ›› Issue (1) : 127-129.

Preliminary talking about tender be selected with lower quoted price during calling tenders and bidding for project

  • Dong ding-yan
Author information +
History +

Abstract

Aimed at the phenomenon of the tender be selected with lower quoted price occurred in current market of calling tenders and bidding for project,the corrupt practices of the tender be selected with lower quoted price are expounded in this paper. From the aspects of system,management ,quality, etc,how to prevent the tender be selected with lower quoted price ,as well as the countermeasures which should be adopted by construction enterprises,has been discussed in detail also. The author appeals strongly that the architecture market should be a standardized market and opposes the vicious competition.

Key words

project / tender be selected with lower quoted price / countermeasure

Cite this article

Download Citations
Dong ding-yan. Preliminary talking about tender be selected with lower quoted price during calling tenders and bidding for project[J]. Journal of Railway Engineering Society, 2002, 19(1): 127-129
PDF(124 KB)

2773

Accesses

0

Citation

Detail

Sections
Recommended

/