STUDY ON SEVERAL PROBLEMS CORRESPONDING TO STATION AND YARD OF HIGH-SPEED RAILWAY

YAN ju-ping

Journal of Railway Engineering Society ›› 2002, Vol. 19 ›› Issue (2) : 75-81.

PDF(200 KB)
PDF(200 KB)
Journal of Railway Engineering Society ›› 2002, Vol. 19 ›› Issue (2) : 75-81.

STUDY ON SEVERAL PROBLEMS CORRESPONDING TO STATION AND YARD OF HIGH-SPEED RAILWAY

  • YAN ju-ping
Author information +
History +

Abstract

This paper sums up experiences and lessons in the aspects of high-speed railway construction and transport organization patterns in Japan and Germany. Combining the preliminary study and design circumstances of high-speed railways in China,it conducts valuable study on several problems corresponding to station and yard of high-speed railway that have not been conducted deep study at current stage. These problems include the connecting mode between the stations of high-speed railway and that of the existing line,the options of operating pattern of high-speed railway,standard plane layout of the station of high- speed railway and its application scope. It sums up the design of stations and yards of the proposed Beijing-Shanghai High-speed Railway corresponding to the relative problems,which can be referred for study and design of high-speed railway in the future.

Key words

high-speed railway / station and yard / plane layout / transport organization

Cite this article

Download Citations
YAN ju-ping. STUDY ON SEVERAL PROBLEMS CORRESPONDING TO STATION AND YARD OF HIGH-SPEED RAILWAY[J]. Journal of Railway Engineering Society, 2002, 19(2): 75-81

References

[1]铁科院.高速铁路线桥结构与技术条件(标准)研究报告 [R],1996.
[2]鄢巨平.赴日考察收集自日本铁道建设公团的资料[Z].
PDF(200 KB)

2891

Accesses

0

Citation

Detail

Sections
Recommended

/