CONSTRUCTION METHOD OF FILLING SUBGRADE WITH HIGH MOISTURE CONTENT D GROUP FILLER IMPROVED BY MIXING

PENG Jing-shu; XU Jia-wen

Journal of Railway Engineering Society ›› 2002, Vol. 19 ›› Issue (3) : 26-30.

PDF(139 KB)
PDF(139 KB)
Journal of Railway Engineering Society ›› 2002, Vol. 19 ›› Issue (3) : 26-30.

CONSTRUCTION METHOD OF FILLING SUBGRADE WITH HIGH MOISTURE CONTENT D GROUP FILLER IMPROVED BY MIXING

  • PENG Jing-shu; XU Jia-wen
Author information +
History +

Abstract

This paper briefly introduces the construction method of filling subgrade with high moisture content D group filler improved by mixing,when the coastal railway subgrade filler can't meet the requirements of code for design on subgrade of railway. This method quickens construction progress,and ensures the time limit of project and the quality of embanking. It can be taken for reference to engineers and technicians.

Key words

embanking filler / D group filler / improved by mixing / ensure quality

Cite this article

Download Citations
PENG Jing-shu, XU Jia-wen. CONSTRUCTION METHOD OF FILLING SUBGRADE WITH HIGH MOISTURE CONTENT D GROUP FILLER IMPROVED BY MIXING[J]. Journal of Railway Engineering Society, 2002, 19(3): 26-30
PDF(139 KB)

2785

Accesses

0

Citation

Detail

Sections
Recommended

/