THE QUANTITY CONTROL OF EARLY STRENGTH AND HIGH PERFORMANCE CONCRETE UNDER LOW (NEGATIVE) TEMPERATURE IN PLATEAU FROZEN SOIL DISTRICT OF QINGHAI-TIBET RAILWAY

GU Lian-ping

Journal of Railway Engineering Society ›› 2004, Vol. 21 ›› Issue (1) : 34-38.

PDF(250 KB)
PDF(250 KB)
Journal of Railway Engineering Society ›› 2004, Vol. 21 ›› Issue (1) : 34-38.

THE QUANTITY CONTROL OF EARLY STRENGTH AND HIGH PERFORMANCE CONCRETE UNDER LOW (NEGATIVE) TEMPERATURE IN PLATEAU FROZEN SOIL DISTRICT OF QINGHAI-TIBET RAILWAY

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2004, 21(1): 34-38

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(250 KB)

Accesses

Citation

Detail

Sections
Recommended

/