
THE QUALITY SUPERVISION OF PASSING THE EXITING LINE ADOPTED THE SUPER SHALLOW BURIED SUBSURFACE EXCAVATION METHOD
YANG Hong,HAN Jin-gang
Journal of Railway Engineering Society ›› 2005, Vol. 22 ›› Issue (5) : 71-74.
THE QUALITY SUPERVISION OF PASSING THE EXITING LINE ADOPTED THE SUPER SHALLOW BURIED SUBSURFACE EXCAVATION METHOD
{{custom_ref.label}} |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
/
〈 |
|
〉 |