APPLICATION OF THAT REPAIR THE DISSOLUTION CAVES WITH THE PILE OF HIGH PRESSURE AND REUNITE FOUNDATION

LIN Mu-guo, LI Ming-hua

Journal of Railway Engineering Society ›› 2006, Vol. 23 ›› Issue (2) : 64-66.

PDF(319 KB)
PDF(319 KB)
Journal of Railway Engineering Society ›› 2006, Vol. 23 ›› Issue (2) : 64-66.

APPLICATION OF THAT REPAIR THE DISSOLUTION CAVES WITH THE PILE OF HIGH PRESSURE AND REUNITE FOUNDATION

  • LIN Mu-guo1, LI Ming-hua2
Author information +
History +

Abstract

Research purposes: In the construction of tunnels for railway and highway, the hole repair is the intractability problem and there are less mature schemes. This paper investigated the best measures that how repair the dissolution caves during construction the tunnel in railway or highway.
Research methods: In this paper, as the zee can tunnels of 319 country highway for example the author introduced the repair scheme of hole with the pile of high pressure and reunite foundation, construction method, construction technology and analyzed the principle and the procedure and the measures in quantity.
Research Conclusions: Using the method that repair the hole with the pile of high pressure and reunite foundation is the better method.

Key words

tunnel / hole / pile of high pressure / reunite foundation / apply

Cite this article

Download Citations
LIN Mu-guo, LI Ming-hua. APPLICATION OF THAT REPAIR THE DISSOLUTION CAVES WITH THE PILE OF HIGH PRESSURE AND REUNITE FOUNDATION[J]. Journal of Railway Engineering Society, 2006, 23(2): 64-66

References

[1]徐至钧高压喷射注浆法处理地基[M].北京:机械工业出版社,2004.
[2]钱东升.公路隧道施工技术[M].北京:人民交通出版社,2002.
[3]铁道部第二工程局.铁路工程施工技术手册(隧道分册)[M].北京:中国铁道出版社,1999.
[4]建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002.
[5]王毅才.隧道工程[M].北京:人民交通出版社,2000.
[6]黄成光.公路隧道施工[M].北京:人民交通出版社,2001.
[7]李宁军,曹文贵,刘生.隧道设计与施工百问[M].北京:人民交通出版社,2004.
[8]钟桂彤.铁路隧道[M].北京:中国铁道出版社,1995.