Design and Research on the Construction Scheme of Concrete Simply Supported Box Girder in Bridge-Tunnel Connection Section on Wuhan-Guangzhou Passenger Dedicated Line

CHEN Lie

Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (10) : 40-43.

PDF(377 KB)
PDF(377 KB)
Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (10) : 40-43.

Design and Research on the Construction Scheme of Concrete Simply Supported Box Girder in Bridge-Tunnel Connection Section on Wuhan-Guangzhou Passenger Dedicated Line

  • CHEN Lie
Author information +
History +

Abstract

Research purposes: To resolve the problem that the transportation of the integral simply supported box girder can not pass the tunnel in the bridge-tunnel connection section of Shaoguan-Huadu section on Wuhan-Guangzhou passenger dedicated line.
Research methods: Aiming at natural conditions and distribution of bridges and tunnels, systematic analysis has been done from aspects of technical feasibility, economical rationality, construction period, the structural form of box girder and so on.
Research results: Eight feasible schemes have been proposed, and combining with the practical situation of the engineering, schemes such as adding construction and receiving yards for girder structure, casting-in-situ the integral box girder, post concreting for partial flange plate of integral box girder, etc. have been adopted in order to meet the requirements of the engineering construction.
Research conclusions: The construction of simply supported 6oz girder in bridge-tunnel connection section on passenger dedicated line can be chosen by comparing various schemes synthetically such as adding construction and receiving yards for girder to avoid increasing the section of the tunnel for the transporting of the girder through it, casting-in-situ the girder, replacing integral box girder with twin-piece composite box girder, replacing integral box girder with multi-piece type box girder, post concreting partial flange plate of integral box girder, building access road to avoid the tunnel for transporting the girder and replacing concrete integral box girder with combined structure or long span concrete bridge, etc.

Key words

Key words / Wuhan-Guangzhou PDL / bridge-tunnel connection section / simply supported box girder / construction scheme

Cite this article

Download Citations
CHEN Lie. Design and Research on the Construction Scheme of Concrete Simply Supported Box Girder in Bridge-Tunnel Connection Section on Wuhan-Guangzhou Passenger Dedicated Line[J]. Journal of Railway Engineering Society, 2007, 24(10): 40-43

References

[1]铁建设[2007 ] 47号,新建时速300一350公里客运专线 铁路设计暂行规定(上、下)[S].
[2]王其昌高速铁路土木工程[M].成都:西南交通大学出 版社,1999.
[3]刘亚滨,刘国利.整孔箱梁架桥机穿越隧道及隧道口架 梁技术方案[J].铁道标准设计,2004(12):37-42.
PDF(377 KB)

2869

Accesses

0

Citation

Detail

Sections
Recommended

/