Preliminary Analysis of Station Design for Speed-up and Capacity Expansion Project in Rebuilding Jiao Ji Railway

ZHANG Kun

Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (4) : 100-102.

PDF(125 KB)
PDF(125 KB)
Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (4) : 100-102.

Preliminary Analysis of Station Design for Speed-up and Capacity Expansion Project in Rebuilding Jiao Ji Railway

  • ZHANG Kun
Author information +
History +

Abstract

Research purposes: This paper discusses the station design problems of mixed passenger and relight railway which come into being in the project of speeding up and capacity extending to 200km/h targeted speed.
Research methods: The research is based on station adjustment and design status of Jiao Ji railway line.
Research results: This paper identifies the station distributing and task properties according to the factors of distance between stations,volume of goods traffic and passenger flow attracting , presents turnout , design standard of 200km/h mixed passenger and relight railway station design through the summary of station design.
Research Conclusions: At present temporary rule is recognized as the design guide for 200 km/h and above 200km/h railway trunk line. We can take the actual operating results of the Jiao Ji railway as the reference to improve the technique system.

Key words

adjustment of productivity layout / turnout / platform / safety siding

Cite this article

Download Citations
ZHANG Kun. Preliminary Analysis of Station Design for Speed-up and Capacity Expansion Project in Rebuilding Jiao Ji Railway[J]. Journal of Railway Engineering Society, 2007, 24(4): 100-102

References

[1 ] GB 50091—2006,铁路车站及枢纽设计规范[S].
[2]铁建设函[2005 ] 285号,新建时速200公里客货共线铁 路设计暂性规定[S].
[3]铁建设[2005]140号,新建时速200-250公里客运专线 设计暂行规定[S].
[4]铁运[2005 ]23号,铁路线路维修规则[S].
[5]王南.浅议速度目标值对站场设计的影响[J].铁道标 准设计,2006(增刊):135-137.
PDF(125 KB)

Accesses

Citation

Detail

Sections
Recommended

/