Feasibility Study of the Underpinning Method under Civil Air Defense Marketplace

KANG Zhi

Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (4) : 108-112.

PDF(196 KB)
PDF(196 KB)
Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (4) : 108-112.

Feasibility Study of the Underpinning Method under Civil Air Defense Marketplace

  • KANG Zhi
Author information +
History +

Abstract

Research purposes: This paper gives some experiences in railway designing in the condition of having buildings by introducing the designing of railway with having civil air defense marketplace.
Research methods: According to the real construction situation of railway station under civil air defense under the East Straight Street in Haerbin,the analysis and research have been made by adopting the methods of finite analysis and structure analysis on the railway station under civil air defense based on the analysis of initiative underpinning method.
Research results: After two underpinning to marketplace structure,the possible different settlement of 1 .7-2. 4 mm are banished and then the maximal settlement between side walls and pillars of 8. 4 mm is eliminated. In the whole construction,the method assures the traffic in sequence and the business in normal. And it is an effect method to put in practice.
Research conclusions: It is feasible to adopt the underpinning method to marketplace underground in construction. There are many questions to research in design of buildings which are in the condition of having buildings underground and adopt the initiative underpinning technology,and it is the research direction in the following work.

Key words

railway station / civil air defense / underpinning method

Cite this article

Download Citations
KANG Zhi. Feasibility Study of the Underpinning Method under Civil Air Defense Marketplace[J]. Journal of Railway Engineering Society, 2007, 24(4): 108-112

References

[1]施仲衡.地下铁道设计与施工[M].西安:陕西科学技术 出版社,1997.
[2]铁道第三勘察设计院.哈尔滨地铁1号线土建1. 3标段 投标文件[Z].天津:铁道第三勘察设计院,2004.
[3]上海市隧道工程轨道交通设计研究院.哈尔滨地铁1号 线总体设计文件[Z].上海:上海市隧道工程轨道交通设 计研究院,2005.
[4]YB9258—97,建筑基坑工程技术规范[S].
PDF(196 KB)

2773

Accesses

0

Citation

Detail

Sections
Recommended

/