The Geological Route Selection of Tiandong-Debao Railway in Depletion Region of Xiaolong Coal Mine

SHI Huan-sheng

Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (9) : 14-16.

PDF(354 KB)
PDF(354 KB)
Journal of Railway Engineering Society ›› 2007, Vol. 24 ›› Issue (9) : 14-16.

The Geological Route Selection of Tiandong-Debao Railway in Depletion Region of Xiaolong Coal Mine

  • SHI Huan-sheng
Author information +
History +

Abstract

Research purposes: Tiandong-Debao Railway is located in Youjiang Basin,passing through the depletion region of Xiaolong Mine and the stability of depletion region is crucial to the route selection of the railway. The analyses and evaluation of the stability of the depletion region are made in this paper for the purpose of providing reference basis for the geological route selection.
Research methods: Through making investigation and survey of the geological conditions of depletion region, exploitation of coal and surface deformation in details, the calculation, analysis and evaluation are made for the stability of depletion region with the theory, and the rational design program is proposed based on making comparisons among three programs of route selection.
Research results: The surface deformation of depletion region is big, the depletion region is in the active period of movement and deformation and the max. estimated subsidence value will be 1 .61 m.
Research conclusions : The stability of depletion region is very bad. If treating it , there are lots of difficulties and it needs lots of money, so the proposals are made that the railway should keep away from the depletion region and the CK Program should be adopted,which can save lots of cost.

Key words

Tiandong-Debao Railway / depletion region of coal mine / geological route selection

Cite this article

Download Citations
SHI Huan-sheng. The Geological Route Selection of Tiandong-Debao Railway in Depletion Region of Xiaolong Coal Mine[J]. Journal of Railway Engineering Society, 2007, 24(9): 14-16

References

[1]铁道第一勘察设计院.铁路工程地质实例(西北及相邻 地区分册)[K].北京:中国铁道出版社,2002.
[2]铁道第一勘察设计院.铁路工程地质手册[K].修订 版北京:中国铁道出版社,1999.
[3]林宗元.岩土工程勘察设计手册[K].沈阳:辽宁科学技 术出版社,1996.
[4]TB 10027—2001,铁路工程不良地质勘察规程[S].
[5]方宝明,常允新.西港煤矿采区地面形变分析[J].水文 地质工程地质,2006,33(4):13-15.
PDF(354 KB)

2655

Accesses

0

Citation

Detail

Sections
Recommended

/