Analysis of the Key Process and the Technical Method for Construction of the Bridge and Culvert Base on Existing Line with Jacking Method

ZHANG Qun-sheng

Journal of Railway Engineering Society ›› 2008, Vol. 25 ›› Issue (3) : 33-37.

PDF(426 KB)
PDF(426 KB)
Journal of Railway Engineering Society ›› 2008, Vol. 25 ›› Issue (3) : 33-37.

Analysis of the Key Process and the Technical Method for Construction of the Bridge and Culvert Base on Existing Line with Jacking Method

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2008, 25(3): 33-37

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(426 KB)

Accesses

Citation

Detail

Sections
Recommended

/