Earthquake Disaster Characteristics of Tunnel 109 on Baoji—Chengdu Railway and Measures for Urgent Repair and Treatment

MENG Xiang—lian

Journal of Railway Engineering Society ›› 2009, Vol. 26 ›› Issue (6) : 91-93.

PDF(341 KB)
PDF(341 KB)
Journal of Railway Engineering Society ›› 2009, Vol. 26 ›› Issue (6) : 91-93.

Earthquake Disaster Characteristics of Tunnel 109 on Baoji—Chengdu Railway and Measures for Urgent Repair and Treatment

  • MENG Xiang—lian
Author information +
History +

Abstract

Research purposes: The”5·12 Wenchuan Earthquake”brought the mountain collapses to damage the Tunnel 1 09 and the running freight train,resulting in oil tank cars firing in the tunnel and interruption of Bali—Chengdu Railway.Whether the railway could be reopen to tratfic in short time became the focal point in urgent repair work.This paper sums up the survey and design experiences in urgent repair of the tunnel for the purpose of providing the reference to the similar work.
Research conclusions: Improvement of emergency systems is the base of urgent repair work.The scientific thoughts 0n urgent repair work is the core for guiding the urgent repair work.Rapid action and flexible working style are the principle of the urgent repair work.The perfect survey and design works for the traffic facilities in mountain area are the premises Of preventing and reducing disasters and are also the basis for studying the program of changing route.

Key words

Tunnel 109 / earthquake disaster / collapse / urgent repair / treatment measure

Cite this article

Download Citations
MENG Xiang—lian. Earthquake Disaster Characteristics of Tunnel 109 on Baoji—Chengdu Railway and Measures for Urgent Repair and Treatment[J]. Journal of Railway Engineering Society, 2009, 26(6): 91-93

References

[1] 杨国柱,等.宝成铁路109隧道抢险加固整治报告[R]. 西安:中铁第一勘察设计院集团有限公司, 2008.
[2] 王晓智,等.宝成铁路109隧道改线工程设计文件[Z ]. 西安:中铁第一勘察设计院集团有限公司, 2008.
[3] 李兴龙,等.宝成铁路109隧道地灾评估报告[R ].西 安:中铁第一勘察设计院集团有限公司, 2008.
 
PDF(341 KB)

2903

Accesses

0

Citation

Detail

Sections
Recommended

/