[1] 孔祥金.青岛胶州湾海底隧道开工[J].公路隧道, 2007 (3): 65 -67. Kong Xiangjin. Jiaozhou Bay Tunnel in Qingdao is Starting Working[J].Highroad Tunnel, 2007(3):65 -67.
[2] 罗先钰等.青岛海底隧道F 3断裂分析评价[J].铁道勘察, 2006(5): 61 -62.
Luo Xianyu. Analysis and Evaluation on Fracture F3 in Qingdao Harbour Tunnel at Sea Bottom [J]. Journal of Railway Survey, 2006(5): 61 -62.
[3] 张建宾.胶州湾隧道穿越海底断层破碎带施工方案探讨[J].铁道工程学报, 2008(5): 66 -68.
Zhang Jianbin. Discussion on the Construction Scheme a of Jiaozhou Bay Tunnel Crossing Seabed Fault Zone[J]. Journal of Railway Engineering Society, 2008(5): 66 -68.
[4] GROV Eivind, NILSEN Bjorn. Subsea Tunnel Projects in Hard Rock Environment in Scadinavia [J]. Chinese Journal of Rock Mechanics and Engineering, 2007
(11): 2176 -2192.
[5] Kunt F. Garshol. Pre - grouting in Rock Tunnel Projects[M ]. Underground Construction Group, MBT International, 2001.
[6] 傅德明.世界三大海底隧道工程[Z ].上海:隧道施工技术研究所, 1999.
Fu Deming. Three Great Subsea Tunnel Projects[Z ]. Shanghai: Tunnel Construction Technology Institute,1999.
[7] 郝哲,等.岩体注浆理论与应用[M ].北京:地质出版社,2006.
Hao Zhe, etc. Theory and Application of Rock Grouting[M ].Beijing:Geology Publishing Company,2006.
[8] 程骁,张凤祥.土建注浆施工与效果检测[M ].上海:同济大学出版社, 1999.
Cheng Xiao, Zhang Fengxiang. Civil Engineering Grouting and Effect Inspection [M ]. Shanghai: Tongji University of Publishing Company, 1999.
[9] 陈铁林,滕红军,张顶立.厦门翔安海底隧道富水砂层注浆试验[J].岩石力学与工程学报, 2007(增2): 3711 -3717.
Chen Tielin, Teng Hongjun, Zhang Dingli. Grouting Test on Water -enriched Sand Layer of Xiamen Xiang.
an Subsea Tunnel [ J ]. Chinese Journal of Rock Mechanics and Engineering, 2007(Supp.2) 3711 -3717.
[10]吴贵生.试验设计与数据处理[M ].北京:冶金出版社,1997.
Wu Guisheng. Experiment Design and Data Processing[M ]. Beijing: Metallurgy Publishing Company, 1997.