Application of Advanced Geological Prediction System TSP 203 Plus in Advanced Geological Prediction of Fault for Construction of Gaozhuding Tunnel

HU Hui - rong,YU Gui

Journal of Railway Engineering Society ›› 2011, Vol. 28 ›› Issue (5) : 1-4.

PDF(563 KB)
PDF(563 KB)
Journal of Railway Engineering Society ›› 2011, Vol. 28 ›› Issue (5) : 1-4.

Application of Advanced Geological Prediction System TSP 203 Plus in Advanced Geological Prediction of Fault for Construction of Gaozhuding Tunnel

  • HU Hui - rong,YU Gui
Author information +
History +

Abstract

Research purposes: The fault F1 at the Gaozhuding Tunnel is a huge fault and it may produce some effects on stability of surrounding rocks during the tunnel construction ,so it is necessary to conduct the accurate advanced prediction of the fault.
Research conclusions: ( 1) TSP 203 plus is a long distance geological prediction system,and the distance is in 100 ~ 150 m; ( 2) Application of TSP 203 plus in the advanced geological prediction can rapidly and accurately judge the geological condition of the predicted area and it is crucial to choice of the construction scheme and measures of the tunnel,with the obvious economic benefits. ( 3) The application of the TSP 203 plus in geological prediction of the F1 fault for the Gaozhuding Tunnel guaranteed the construction safety and speeded up the construction process while the some experiences of the advanced geological prediction for tunnel were accumulated.

Key words

TSP 203 plus / advanced geological prediction / construction of tunnel / faults / application

Cite this article

Download Citations
HU Hui - rong, YU Gui. Application of Advanced Geological Prediction System TSP 203 Plus in Advanced Geological Prediction of Fault for Construction of Gaozhuding Tunnel[J]. Journal of Railway Engineering Society, 2011, 28(5): 1-4

References

[1] 赵勇,肖书安,刘志刚. TSP 超前地质预报系统在隧道工程中的应用[J]. 铁道建筑技术,2003 ( 5) : 18 -22.
Zhao Yong,Xiao Shu’an,Liu Zhigang. Application of TSP Geological Advanced Prediction System in Tunnel Engineering [J]. Railway Construction Technology, 2003( 5) : 18 - 22.
[2] 何振起,李海,梁彦忠. 利用地震反射法进行隧道施工地质超前预报[J]. 铁道工程学报,2000( 4) : 81 -85.
He Zhenqi,Li Hai,Liang Yanzhong. Geological Super - leading Forecast During Tunnel Construction by Utilizing Seismic Response Analysis Method [J]. Journal of Railway Engineering Society,2000( 4) : 81 - 85.
[3] 肖书安,吴世林. 复杂地质条件下的隧道地质超前探测技术[J]. 工程地球物理学报,2004( 2) : 159 -165.
Xiao Shu ’ an, Wu Shilin. Geological Prediction Technique for Tunnel Construction under Complex Geological Conditions [J ]. Chinese Journal of Engineering Geophysics,2004( 2) : 159 - 165.
[4] 温树林,吴世林. TSP 203 在云南元磨高速公路隧道超前地质预报中的应用[J]. 地球物理学进展,2003: 465 - 471.
Wen Shulin,Wu Shilin. Application of the TSP 203 System in Geological Advanced Prediction of YuanMo Expressway Tunnel[J]. Progress In Geophysics,2003: 465 - 471.
[5] 陈建峰. 隧道施工地质超前预报技术比较[J]. 地下空间,2003( 1) : 5 -8.
Chen Jianfeng. Geological Prediction Technique Comparison of Tunnel Construction [J]. Underground Space,2003( 1) : 5 - 8.
[6] 王兴照. TSP 203 plus 超前地质预报在琯头岭隧道断层中的应用[J]. 福建建筑,2008( 5) : 44 -46.
Wang Xingzhao. Leading Geological Forecast of TSP 203 Plus Applied to the Fault Zone of Guan Tou Ling Tunnel[J]. Fujian Architecture & Construction,2008 ( 5) : 44 -46.
[7] 张志龙,王兰生,王跃飞,等. 雪峰山高速公路隧道 F2 断层带的综合超前地质预报[J]. 岩石力学与工程学报, 2007( S1) : 3311 - 3315.
Zhang Zhilong,Wang Lansheng,Wang Yuefei,etc. Comprehensive Advanced Geological Prediction of Fault F2 in Xuefeng Mountain Highway Tunnel [J]. Chinese Journal of Mechanics and Engineering,2007( S1) : 3311 - 3315.
 
PDF(563 KB)

2857

Accesses

0

Citation

Detail

Sections
Recommended

/