Abstract

Research purposes:The newly一built Chongqing一Guiyang Railway,located in the southwestern Chongqing Municipality and northen Guizhou Province,longitudinally passes through the municipality and province and it is the main railway to connect the northwest China with Sichuan,Chongqing and the Pan一pearl River Delta Zone. As this railway starts from the relatively lower terrain of the Sichuan Basin,stretches to the Yunnan一Guizhou Plateau and crosses the Sichuan一Yunnan folded region,the land forms fluctuate largely,the geologic structure is complicated and the unfavorable geological condition and special rock and soil are found everywhere. So it is necessary to well know the key engineering geology issues for the railway alignment.
Research conclusions:(1)The karst is the most unfavorable geological object and has huge harm and impact on the railway construction.(2)The major unfavorable geological problems of the mineral deposit and the mined一out area are crucial to the railway construction. The railway should keep away from the small mining areas as much as possible.(3)The major geologic structures of the mining area are the north一south,east一north and north一north structures. The railway also should keep away from the fault zone that stretches along the layer In the meantime,the height of the side slope should be strictly controlled,and the measures of reinforcing the side slope and cutting and preventions of the tunnel's bedding sliding and bias pressure should be taken.(4)The railway line's expansion program should as much as possible avoid changing or demolishing the building which would cause resurrection of geological disease.

Key words

Chongqing—Guiyang Railway / engineering geology / alignment

Cite this article

Download Citations
XU Zheng—xuan. Studies on Key Engineering Geology Issues and Geological Alignment of Newly—built Chongqing—Guiyang Railway[J]. Journal of Railway Engineering Society, 2012, 29(12): 15-20

References

[1] TB 10012--2007,铁路工程地质勘察规范[S].
TB 10012--2007,Code for Geology Investigation of Railway Engineering[S].
[2] TB 10038--2001,铁路工程特殊岩土勘察规程[S].
TB 10038--2001.Code for Special Rock and Soil Investigation of Railway Engineering[S].
[3] TB 10027--2001,铁路工程不良地质勘察规程[s].
TB 10027--2001,Code for Unfavorable Geological Condition Investigation of Railway Engineering[S].
[4] TBJ 10014 98,铁路工程地质钻探规程[S].
TBJ 10014--98,Code for Geological Drilling Regulation of Railway Engineering[S].
[5] 冯建林,徐正宣,索朗,等.改建铁路重庆至贵阳线工程地质报告[R].成都:中铁二院工程集团有限责任公司,2009.
Feng Jianlin,Xu Zhengxuan,SuoLang,etc.Engineering Geology Report on Reconstruction of Chongqing to Guiyang Route[R].Chengdu:China Railway Eryuan Engineering Group Co.Ltd,2009.
[6] 张昆,郭菊彬,李建强.埃塞俄比亚新建铁路主要工程地质问题及对策[J].铁道工程学报,2011(10):38—41.
Zhang Kun,Guo Jubin,Li Jianqiang.Countermeasure and Primary Engineering Geological Problems of Newly—built Ethiopian Railway[J].Journal of Railway Engineering Society,2011(10):38—41.
[7]徐正宣,张昆,唐林.埃塞俄比亚铁路工程地质勘察探讨[J].铁道工程学报,2012(5):26—29.
Xu Zhengxuan,Zhang Kun,TangLin.On Engineering Geological Investigation of Ethiopian Railway[J].Journal of Railway Engineering Society,2012(5):26—29.
 