Optimal Design of Temporary Water Bridge and Platform Located in Artificial Covering Layer

HUANG Huai - peng

Journal of Railway Engineering Society ›› 2012, Vol. 29 ›› Issue (3) : 44-48.

PDF(672 KB)
PDF(672 KB)
Journal of Railway Engineering Society ›› 2012, Vol. 29 ›› Issue (3) : 44-48.

Optimal Design of Temporary Water Bridge and Platform Located in Artificial Covering Layer

  • HUANG Huai - peng
Author information +
History +

Abstract

Research purposes: By analyzing the depth into the rock of artificial covering layer and the overall stability of structure under different boundary conditions,and providing an optimal design method that is used to temporary water bridge and platform in the condition of deepwater’s bare rock bed,their safety and reliability are ensured.
Research conclusions: ( 1) To reduce the workload of blasting,the form of short piling can be used in the artificial covering layer at bare rock bed. The depth into rock,that is calculated by using“Lalyqin hypothesis”in the short piling condition,can make sure their safety and reliability; ( 2) Because inability to accurately calculate the artificial covering layer for bridge pile and piles of lateral resistance platform,two constraint ways of hinge end and consolidation at the bottom of pile can be used for calculation. The actual results are between their two results; ( 3) If temporary bridge piles and platform piles can’t meet the safety and reliability requirements in an independent state,the connection between the two systems should be increased. The specifications,quantity and location of the connection system need to be analyzed by the overall analysis of system’s strength and stability.

Key words

bare rock bed / artificial covering layer / water operations / structural design

Cite this article

Download Citations
HUANG Huai - peng. Optimal Design of Temporary Water Bridge and Platform Located in Artificial Covering Layer[J]. Journal of Railway Engineering Society, 2012, 29(3): 44-48

References

[1] 周宏,蒙媛. 深水裸岩河床上钻孔桩护筒施工平台的搭设[J]. 施工技术, 2009( 5) : 69 - 70.
Zhou Hong,Meng Yuan. Building of Construction Platform for Steel Casing of Bored Piles in Deep Water and Uncovered Rock [J]. Construction Technology,2009( 8) : 69 - 70.
[2] 欧阳效勇,任国兴,徐炜. 桥梁深水桩基础施工关键技术[M]. 北京: 人民交通出版社, 2006.
Ouyang Xiaoyong, Ren Guoxing, Xu Wei. Key Cconstruction Contechnologies of Bridge Piles Foundation in Deep Water [M]. Beijing: China Communications Press,2006.
[3] 胡国伟,张宇宁,张俊兵,等. 大跨度复杂结构桥梁施工全过程结构空间受力特性研究[J]. 铁道工程学报, 2010( 3) : 43 - 48.
HU Guowei, Zhang Yuning, Zhang Junbing, etc.Research on the Space Stress - distribution Characteristics of Long - span and Complex Structure Bridge during the Whole Construction Process [J].Journal of Railway Engineering Society,2010( 3) : 43 -48.
[4] 胡永,郭庆智,张会俊. 柳州三门江大桥深水裸岩钻孔平台设计与施工[J]. 西部探矿工程, 2007( 6) : 15 - 18.
Hu Yong,Guo Qingzhi,Zhang Huijun. Design and Construction Ofbored Pile Platform in Deep Water and Uncovered Rock of Sanmenjiang Bridge in Liuzhou[J].West China Exploration Engineering,2007( 6) : 15 - 18.
[5] 谢光建,邹高定,彭宁. 在裸岩河床区的水上移动网架平台施工技术[J]. 西部探矿工程, 2009( 3) : 163 - 165.
Xie Guangjian,Zou Gaoding,Peng Ning. Application for Movable Lattice Grid Platform Construction Technic in the Bare Rock StreamBed Area[J]. West China Exploration Engineering,2009,( 3) : 163 - 165.
 
PDF(672 KB)

2789

Accesses

0

Citation

Detail

Sections
Recommended

/