Abstract

Research purposes: In coastal area,the blowing sand reclaimation becomes more and more popular,so it is necessary to do the research on how to effectively and economically treat the foundation base in the reclaimation area and how to establish the reasonable numerical model to make the project the most economic and reasonable.
Research conclusions: According to the characteristics of disposal engineering of the foundation of the blowing sand reclaimation,a 3 - D numerical model was established to study the settlement caused by the dynamic compaction. Its results was compared with the data of some actual projects for treating the sand - soil with the dynamic compaction method. By loading with compaction hammer,the volume of void was decreased and the density of the soil was increased,obtaining good treatment result. This method was available for treating the foundation of blowing sand reclaimation in the coastal area. The most reasonable dynamic compaction parameters were got by comparing and analyzing the numerical simulation research and the actual project,and it could provide the reference to the similar works.

Key words

foundation of blowing sand reclamation / dynamic compaction / numerical simulation

Cite this article

Download Citations
DENG Man - xiang. Research on Dynamic Compaction of Foundation of Blowing Sand Reclaimation[J]. Journal of Railway Engineering Society, 2012, 29(5): 11-13

References

[1] TB 10001—2005,铁路路基设计规范[S].
TB 10001—2005, Code for Design on Subgrade of Railway[S].
[2] TB 10001—2005,铁路特殊路基设计规范[S]. TB 10001—2005,Code for Design on Special Subgrade of Railway [S].
[3] JGJ 79—2002 ,建筑地基处理技术规范[S].
JGJ 79—2002,Technical Code for Ground Treatment of Buildings [S].
[4] TB 10501—98,铁路工程环境保护设计规范[S].
TB 10501—98, Code for Environmental Protection Design of Railway Engineering[S].
[5] 杨啸,杨国林. 高速铁路无砟轨道红黏土地基沉降计算方法[J]. 铁道工程学报,2011( 5) : 27 -33.
Yang Xiao, Yang Guolin. Red Clay Subgrade Settlement Calculation Methods in Ballastless Track Design on High - speed Railway[J]. Journal of Railway Engineering Society,2011( 5) : 27 - 33.
[6] 铁路第一勘察设计院 . 铁路工程设计手册( 路基) [K].北京: 中国铁道出版社,1995.
Railway First Survey and Design Institute. Design Manual of Railway Engineering ( Subgrade) [K]. Beijing: China Railway Publinsing House,1995.
 
PDF(198 KB)

2709

Accesses

0

Citation

Detail

Sections
Recommended

/