Research on Overall Design Plan of Mine Heavy - haul Railway

PAN Guo - qiang

Journal of Railway Engineering Society ›› 2013, Vol. 30 ›› Issue (4) : 6-8.

PDF(223 KB)
PDF(223 KB)
Journal of Railway Engineering Society ›› 2013, Vol. 30 ›› Issue (4) : 6-8.

Research on Overall Design Plan of Mine Heavy - haul Railway

  • PAN Guo - qiang
Author information +
History +

Abstract

Research purposes:With speeding up the pace of China developing the overseas mining resources,the Chinese infrastructure companies took over many mine heavy - haul railway projects,with the axle load of more than 30 t and the traction quality of 20000 t or above. At present,there is no such project in China. This paper presents the overall design plan of the mine heavy - haul railway based on the study on the axile load,traction quality,number of the main track and maximum gradient according to the traffic demand and function orientation in order to break through the traditional design ideas in China.
Research conclusions:From the study it is concluded: (1) The plan of adopting the 37 t axile load and 3500 t traction quality is economic and reasonable.(2) The concept of strengthening the fundamental and weakening the trivial should be followed in matching facilities and the matching facilities should be simple,using China - made products.

Key words

mine railway / heavy - haul design / overall plan / study

Cite this article

Download Citations
PAN Guo - qiang. Research on Overall Design Plan of Mine Heavy - haul Railway[J]. Journal of Railway Engineering Society, 2013, 30(4): 6-8

References

[1] 中铁第四勘察设计院集团有限公司. 国外某甲矿山铁路预可行性研究报告[R].武汉: 中铁第四勘察设计院集团有限公司,2011.
China Railway Siyuan Survey and Design Group Co. Ltd .The Preliminary Feasibility Study Report of a Foreign Mine Railway[R].Wuhan: China Railway Siyuan Survey and Design Group Co.Ltd,2011.
[2] 中铁第四勘察设计院集团有限公司.国外某乙矿山铁路可行性研究报告[R].武汉: 中铁第四勘察设计院集团有限公司,2011.
China Railway Siyuan Survey and Design Group Co. Ltd .The Preliminary Feasibility Study Report of a Foreign Mine Railway[R] Wuhan: China Railway Siyuan Survey and Design Group Co.Ltd ,2011.
[3] 中铁第四勘察设计院集团有限公司.国外某丙矿山铁路预可行性研究报告[R].武汉: 中铁第四勘察设计院集团有限公司,2012.
China Railway Siyuan Survey and Design Group Co. Ltd. The Preliminary Feasibility Study Report of a Foreign Mine Railway[R].Wuhan: China Railway Siyuan Survey and Design Group Co.Ltd ,2012.
[4] 国际重载协会.国际重载铁路最佳应用指南———轮轨关系[M].北京: 中国铁道出版社,2009.
International Heavy Hual Association.Guidelines to Best Practices for Heavy Hual Railway Operations: Wheel and Rail Intereface Issues[M].Beijing: China Railway Publishing House,2009.
[5] 国际重载协会.国际重载铁路最佳应用指南———线路施工与运营维修[M].北京: 中国铁道出版社,2011.
International Heavy Hual Association.Guidelines to Best Practices for Heavy Hual Railway Operations: Line Construction and Operational Maintenance[M]. Beijing: China Railway Publishing House,2011.
[6] 姚远明. 中国铁路产业“走出去”战略研究[M].安徽: 安徽大学出版社,2010.
Yao Yuanming. China Railway Industry Strategy Research for " Going Out " [M].Anhui: Anhui University Press,2010.
[7] 铁道第三勘察设计院集团有限公司.重载铁路设计规范 (征求意见稿)[S].北京: 中国铁道出版社,2011.
The Third Railway Survey and Design Institute Group Co.Ltd.Code for Designing Heavy Haul Railway (Exposure Draft)[S].Beijing: China Railway Publishing House,2011.
[8] 易明.勘察设计企业向国际型工程公司战略转型的思考[J].铁道工程学报,2012(2) :102-105.
Yi Ming. Thoughts on Survey and Design Enterprises Change to International Engineering Companies[J]. Journal of Railway Engineering Society,2012(2) : 102-105.
 
PDF(223 KB)

2687

Accesses

0

Citation

Detail

Sections
Recommended

/