Research on the Evaluation Grade of Seismic Damage and Disposal Technologies of Tunnel Structure

CUI Guang-gao,LIU Wei-dong,ZHAO Rui-hua,WANG Ming-nian,LIN Guo-jin

Journal of Railway Engineering Society ›› 2014, Vol. 31 ›› Issue (5) : 74-78.

PDF(3263 KB)
PDF(3263 KB)
Journal of Railway Engineering Society ›› 2014, Vol. 31 ›› Issue (5) : 74-78.

Research on the Evaluation Grade of Seismic Damage and Disposal Technologies of Tunnel Structure

  • CUI Guang-gao l,LIU Wei-dong l,ZHAO Rui-hua l,WANG Ming-nian 2,LIN Guo-jin 3
Author information +
History +

Abstract

Research purposes:The strong earthquake caused serious damage to the tunnels in disaster area,which seriously affected the progress of the earthquake relief and post-quake reconstruction. This paper, which is based on the seismic damage of the tunnels in Wenchuan earthquake as the research background,with the need of scientific reconstruction,and combined with the characteristics of the three stages,the first aid repair stage,ensure access stage, restoration and reconstruction stage,and the recovery goals of the tunnel structure,has studied the evaluation grade of seismic damage and disposal technologies of different stages of tunnel structure.
Research conclusions:(1)Established the evaluation grade of seismic damage of tunnel structure,mainly including the graded principles of the seismic damage degree of the tunnels,the evaluation grade of seismic damage of reinforced concrete and plain concrete secondary lining, and the treatment key point of seismic damage of the three stages,the first aid repair stage,ensure access stage,restoration and reconstruction stage.(2)Clarified the disposal technologies of seismic damage of tunnel lining structure of three stages,the first aid repair stage,ensure access stage,restoration and reconstruction stage.(3)The disaster area in Wenchuan earthquake used the evaluation grade of seismic damage and disposal technologies of tunnel structure for restoration and reconstruction after the earthquake,reached the goal of restoration and reconstruction,which recovered or over the level of operation and earthquake-resistant of the tunnels in the earthquake zone before earthquakes.(4)The research results can provide a reference for the repair of seismic damage of the tunnels in the earthquake zone and aseismic design of tunnel structure.

Key words

tunnel structure / evaluation grade of tunnel structure seismic damage / disposal technologies / first aid repair stage / ensure access stage / restoration and reconstruction stage

Cite this article

Download Citations
CUI Guang-gao, LIU Wei-dong, ZHAO Rui-hua, et al. Research on the Evaluation Grade of Seismic Damage and Disposal Technologies of Tunnel Structure[J]. Journal of Railway Engineering Society, 2014, 31(5): 74-78

References

[1] JTG H12-2003,公路隧道养护技术规范[S ].
JTG H12—2003, Technical Specification of Maintenance for Highway Tunnel [ S ] .
[2]孟祥连.宝成铁路109隧道震灾特征及抢险整治措施 [J].铁道工程学报,2009(6) :91 -93.
Meng Xianglian. Earthquake Disaster Characteristics of Tunnel 109 on Baoji - Chengdu Railway and Measures for Urgent Repair and Treatment [ J ]. Journal of Railway Engineering Society, 2009(6) :91 -93.
[3]王战兵.隧道病害处治研究[D].西安:长安大学, 2004.
Wang Zhanbing. Research on Disposal Technologies of Tunnel Diseases [ D]. Xi'an: Chang'an University, 2004.
[4] 张茂林.攀田高速公路隧道病害处治技术研究[D].西安:长安大学,2008.
Zhang Maolin. The Traetment Study on Tunnel Disease of PanTian Highway[ D]. Xi'an: Chang’an University, 2008.
[5]钟世航.隧道衬砌质量的检测[J].现代隧道技术,2001 (5):36 -41.
Zhong Shihang. Examining the Quality of the Lining of Tunnels [ J ]. Modern Tunneling Technology, 2001 (5):36 -41.
[6 ] 吕康成.隧道工程试验检测技术[M].北京:人民交通出版社,2001.
Lv Kangcheng. Test Technology of Tunnel Engineering [M ]. Beijing : China Communications Press,2001.
[7] 崔光耀,王明年,林国进,等.汝川地震区典型公路隧道衬砌震害类型统计分析[J].中国地质灾害与防治学报, 2011(1)-.123 -127.
 
PDF(3263 KB)

3098

Accesses

0

Citation

Detail

Sections
Recommended

/