Research on the Critical Manufacturing Technology of 60 kg/m- 62# High-speed Turnout of Harbin-Dalian High Speed Railway |
MENG Xiang-hong |
China Railway Group Limited,Beijing 100039,China |
|
|
Abstract Research purposes: In order to meet the requirement of the construction of Harbin-Dalian High Speed Railway,further improve the efficiency of the railway transportation and shorten the running time,60 kg/m-62# high- speed turnout with speed 350 km/hour is designed out which makes the side allowable speed of turnout achieve 220 km/h. This paper mainly illustrates the critical manufacturing technology and frog assembling and turnout laying technology,to improve the technology of our big size turnout.
Research conclusions:(1)In the producing process of the steel rails that slenderness ratio is 2168,the deformation is controlled,which plays a crucial role in successful trial-production of turnout.(2)The processing quality of the steel rails directly affects the turnout assembly,trial laying and the running state,which is the key of turnout manufacture. (3)The processing technology of the turnout mainly includes processing of steel rails such as switch rails,point rails, wing rails,as well as the plate processing and sulfidizing.(4)The key technology of turnout assembling and laying includes transformation of rail laying assembly platform,determining rail laying assembly benchmark,the initial assembly of rail,rail laying fine adjustment,and so on.(5)The current operation of Harbin-Dalian High Speed Railway shows that the technology of this kind of turnout is advanced enough to achieve the design and high speed running requirements,and is able to be widely used in the high speed railway which the side running speed is 220 km/h.
|
Received: 13 May 2015
|
|
|
|
|
|
Guo Fuan. China's High-speed Turnouts System of Technology [J].Chinese Railways , 2011( 4):1-5.
|
[2] |
郭福安.高速铁路侧向220 km/h道岔的研究[J].中国 铁路,2012(10):8-12.
|
[1] |
郭福安.我国高速道岔技术体系[J].中国铁路2011 (4):1-5.
|
|
Zhang Haihua. Discussion on Key Manufacturing Technology for Turnout of High-speed Railway in China[J].Journal of Railway Engineering Society, 2012(S):122-123.
|
[3] |
张海华.关于我国高速铁路道岔关键制造技术的探讨 [J].铁道工程学报,2012(S):122-123.
|
|
Guo Fuan. Research on High Speed Railway Side 220 km/h Turnouts[J].Chinese Railways,2012(10):8- 12.
|
|
|
|