[5] |
TB 10106-2010,铁路工程地基处理技术规程[S]
|
[3] |
董明.高压旋喷桩与袖阀管注浆技术在高铁软土路基加 固中的应用[J].岩土锚固工程,2014(3) ;38 -41
|
|
TB 10621-2014,Code for Design of High Speed Railway[S].
|
[4] |
赵新益,李时亮,汪莹鹤.铁路软土地基路基沉降控制技 术研究[J].铁道工程学报,2015(5);18-22
|
|
TB 10106-2010 , Technical Code for Ground Treatment of Railway Engineering[S].
|
|
Xu Caifeng. Application of Jet-grouted Pile Combined with Perforated Pipe Grouting in the Soft Foundation Treatment of Existing Railway[J].Resources Environment&Engineering , 2014 ( 2 ) ;164-168.
|
[2] |
徐彩风.旋喷桩联合花管注浆在既有铁路软基处理中的 应用[J].资源环境与工程,2014(2) ;164-168
|
|
Zhao Xinyi, Li Shiliang, Wang Yinghe. Settlement Control Technology of Railway Subgrade on Soft Soil Foundation[J].Journal of Railway Engineering Society,2015(5) ;18-22.
|
[6] |
JGJ 79-2012,建筑地基处理技术规范[S]
|
[1] |
TB 10621-2014,高速铁路设计规范[S].
|
|
JGJ 79-2012 , Technical Code for Ground Treatment of Buildings[S].
|
|
Dong Ming. Application of Jet-grouted Pile and Perforated Pipe Grouting in the Treatment of Soft Foundation[J].Yantu Maogu Gongcheng, 2014(3): 38-41.
|