Research on the Dismantling Temporary Support of Metro Station with Shallow - depth Subsurface - excavated and Large – span

SUN Ke - guo1, GONG Yan - feng2, XU Wei - ping1, QIU Wen - ge1, ZHOU Hui - chao1

Journal of Railway Engineering Society ›› 2016, Vol. 33 ›› Issue (7) : 94-100.

PDF(1523 KB)
PDF(1523 KB)
Journal of Railway Engineering Society ›› 2016, Vol. 33 ›› Issue (7) : 94-100.
Urban Rail Construction

Research on the Dismantling Temporary Support of Metro Station with Shallow - depth Subsurface - excavated and Large – span

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2016, 33(7): 94-100

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(1523 KB)

Accesses

Citation

Detail

Sections
Recommended

/