Journal of Railway Engineering Society  2017, Vol. 34 Issue (8): 93-97    DOI:
Urban Rail Construction Current Issue | Archive | Adv Search |
Research on the Subway Project Insurance Based on Insurance Premium Rate
JIANG Cheng-jie1, WANG Wen2, LIN Gang3
(1. Zhejiang College of Construction, Hangzhou, Zhejiang 311231, China; 2. University of International Business and Economics, Beijing 100029, China; 3. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech