Research on the In-situ Monitoring of Post-construction Settlement of Bridge-subgrade Transition Section |
JIA Liang1, LIANG Rong1, YAO Kai2 |
(1.Lanzhou University of Technology, Lanzhou, Gansu 730050, China; 2.National University of Singapore, Singapore 117576, Singapore) |
|
|
Abstract Abstract:Research purposes: The settlement of back fill behind abutment is the main cause for the differential settlement and the vehicle bumping at bridge-head. To explore the post-construction settlement of bridge-subgrade transition section under self weight and vehicle load, in- situ monitoring of subgrade settlement is carried out on the Lanyon highway. Settlement cells are embedded in various depths of the driveway and the shoulder of highway. Long- term settlement monitoring is conducted to investigate the variation of settlement with time and space, to provide a basic data for future research on bridge-subgrade transition section in highway construction. Research conclusions: (1) The settlement of highway shoulder is greater than that of the driveway;(2) The settlement of subgrade will increase with time, while the settlement of bridge-subgrade transition section tends to be stable after one year;(3) The vehicle load has insignificant effect on the subgrade settlement;(4) Logarithm models can predict the post-construction settlement of the subgrade accurately;(5) This research achievements can provide the reference for the design and construction of bridge-subgrade transition section.
|
Received: 29 March 2017
|
|
|
|
|
|
|