Research on the Design and Construction Scheme of Tracks Connection between Beijing-Tangshan Railway and Tianjin-Qinhuangdao High-speed Railway

LIU Ke

Journal of Railway Engineering Society ›› 2018, Vol. 35 ›› Issue (4) : 39-42.

PDF(458 KB)
PDF(458 KB)
Journal of Railway Engineering Society ›› 2018, Vol. 35 ›› Issue (4) : 39-42.
Main Line: Railway and Rail

Research on the Design and Construction Scheme of Tracks Connection between Beijing-Tangshan Railway and Tianjin-Qinhuangdao High-speed Railway

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2018, 35(4): 39-42

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(458 KB)

Accesses

Citation

Detail

Sections
Recommended

/