Study and Application of the Construction Control for Long-span Low-pylon Cable-stayed Bridge of High Speed Railway

XIE Ming-zhi, WEI Chang-xin, YANG Yong-qing, LI Xiao-bin, ZHANG Ke-yue, ZHANG Tao

Journal of Railway Engineering Society ›› 2018, Vol. 35 ›› Issue (9) : 35-41.

PDF(1105 KB)
PDF(1105 KB)
Journal of Railway Engineering Society ›› 2018, Vol. 35 ›› Issue (9) : 35-41.
Main Line: Bridge Engineering

Study and Application of the Construction Control for Long-span Low-pylon Cable-stayed Bridge of High Speed Railway

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2018, 35(9): 35-41

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(1105 KB)

Accesses

Citation

Detail

Sections
Recommended

/