Research on the TBM Tunnel Passing through Bad Geological Technology and Water Inrush Emergency Measures in Reclamation Area

JIANG Pan

Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (12) : 83-88.

PDF(863 KB)
PDF(863 KB)
Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (12) : 83-88.
Main Line: Tunnel Engineering

Research on the TBM Tunnel Passing through Bad Geological Technology and Water Inrush Emergency Measures in Reclamation Area

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2020, 37(12): 83-88

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(863 KB)

Accesses

Citation

Detail

Sections
Recommended

/