Research on the Dewatering of Foundation Pit near Fenghe River and Temperature Stress of Super Long Subway Station

WANG Shenxia

Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (4) : 85-90.

PDF(535 KB)
PDF(535 KB)
Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (4) : 85-90.
Urban Rail Construction

Research on the Dewatering of Foundation Pit near Fenghe River and Temperature Stress of Super Long Subway Station

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2020, 37(4): 85-90

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(535 KB)

Accesses

Citation

Detail

Sections
Recommended

/