Research on the Time and Space Effect of Tunnel Construction Based on Improved TOPSIS Method

WU Bo, LU Ming, WU Yufang, MENG Guowang, HUANG Wei

Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (5) : 42-46.

PDF(779 KB)
PDF(779 KB)
Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (5) : 42-46.
Main Line: Tunnel Engineering

Research on the Time and Space Effect of Tunnel Construction Based on Improved TOPSIS Method

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2020, 37(5): 42-46

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(779 KB)

Accesses

Citation

Detail

Sections
Recommended

/