Research on the Reasonable Staggered Distance of Tunnel in Shallow Excavated Metro Arch Tunnel in the Loess Area

HU Zhiping, LIU Jiaqi, REN Xiang, MA Jiakuan, ZHAO Bifeng, YANG Hui

Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (9) : 60-65.

PDF(775 KB)
PDF(775 KB)
Journal of Railway Engineering Society ›› 2020, Vol. 37 ›› Issue (9) : 60-65.
Main Line: Tunnel Engineering

Research on the Reasonable Staggered Distance of Tunnel in Shallow Excavated Metro Arch Tunnel in the Loess Area

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2020, 37(9): 60-65

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(775 KB)

Accesses

Citation

Detail

Sections
Recommended

/