Abstract
Research purposes: With the further implementation of the Medium and Long-term Railway Network Plan and the progress of investment and financing system reform, some railways in difficult mountain areas not serving as network trunks and functioning not so important are increasingly put on the agenda. The construction scale of projects often becomes the focus to decide to construct a single-track line, a double-track line, or a single-track line with conditions reserved for future track doubling. So, this paper focuses on those railway projects which must be doubled in the far future (bridges and tunnels accounts for 70% or more), compares and studies the scheme of single-track line, and the scheme of single-track line with conditions reserved for future track doubling, thus proposes suggestions on how to decide the construction scale for difficult mountain railways. Research conclusions: (1) The construction scale of railways project in difficult mountainous areas should take the forecast of traffic volume and the local economic development into consideration. (2) Future track doubling is difficult for mountain railways with 50% or higher bridges & tunnels ratio, and also requires high investment, which is unfavorable for land requisition, demolition and removal, environmental protection and land conservation. (3) In the difficult mountainous areas where double-track line is needed to meet the transportation demand in the long run, it is suggested to construct a double-track line once upon a time through friendly consultation, in line with the principle of scientific demonstration and moderate advance, so as to achieve the best comprehensive benefits. (4) The research results can provide a reference for railway survey and design.
ZHUO Jiancheng. , {{custom_author.name_en}}et al.
Research on the Rationality of Conditions Reservation for Future Track Doubling in Difficult Mountain Areas[J]. Journal of Railway Engineering Society, 2021, 38(4): 7-10
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
References
[1] 中铁二院工程集团有限责任公司.新建温州至武夷山至吉安铁路预可行性研究报告[R].成都:中铁二院工程集团有限责任公司,2020. China Railway Eryuan Engineering Group Co.Ltd. Prefeasibility Study on New Construction of Wenzhou-Wuyishan-Jian Railway[R]. Chengdu: China Railway Eryuan Engineering Group Co.Ltd,2020. [2] 朱颖.铁路选线理念的创新与实践[J].铁道工程学报,2009(6):1-5. Zhu Ying.Innovation and Practice on Railway Location Concept[J]. Journal of Railway Engineering Society, 2009(6):1-5. [3] 朱颖.铁路设计理念的回顾和展望[J].铁道工程学报,2007(1):1-5. Zhu Ying. Review and Prospect of Railway Design Concept[J]. Journal of Railway Engineering Society, 2007(1):1-5. [4] TB 10098—2017,铁路线路设计规范[S] . TB 10098—2017, Code for Design of Railway Line[S]. [5] 中铁二院工程集团有限责任公司. 高速铁路建造技术(设计卷)[M].北京:中国铁道出版社,2015. China Railway Eryuan Engineering Group Co.Ltd. High Speed Railway Construction Technology(Design Volume)[M].Beijing:China Railway Publishing House,2015. [6] 徐涛.复杂艰险山区铁路单线或双线建设规模研究[J].高速铁路技术,2018(4):76-80. Xu Tao. Study on the Construction Scale of Single or Double Track Railway in Complex and Dangerous Mountainous Areas[J]. High Speed Railway Technology,2018(4):76-80. [7] TB 10621—2014,高速铁路设计规范[S]. TB 10621—2014,Code for Design of High Speed Railway [S].