Journal of Railway Engineering Society  2022, Vol. 39 Issue (10): 53-58    DOI:
Main Line: Bridge Engineering Current Issue | Archive | Adv Search |
Research on the Causes and Preventive Measures of Shallow Defects of Cast-in-place Pile
CHANG Juyou1, WANG Chen2, WANG Zhengrong3, HAO Lingxu3, LIAO Zhong1, YANG Hu1
1. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China;
2. Hydro-engineering Team of Sichuan Metallurgical Geology & Exploration Bureau, Chengdu, Sichuan 610032, China;
3. China Railway 12th Bureau Engineering Group Co. Ltd, Taiyuan, Shanxi 030000, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech