Application of Optimizing Stratigraphic Boundary in Improving the Quality of Soft Foundation Exploration |
PENG Guoxi1, JIANG Liangwen1, FAN Aimin2, ZHA Jun3 |
1. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China; 2. China Railway Communications Investment Group Co. Ltd, Nanning, Guangxi 530300, China; 3. Guangxi Communications Design Group Co. Ltd, Nanning, Guangxi 530000, China |
|
|
Abstract Research purposes: Soft ground is one of the most common special rock and soil in the construction of the hill road and railway construction in south China. In construction, if soft ground is treated improperly or not completely, it often leads to the failure of the upper retaining wall, anti-slide pile and other support measures, which affect project construction schedule and late operation safety, and this problem of soft foundation change between hills is becoming increasingly prominent. This paper first analyzes the types of soft foundation between hills and its damage types, discusses the causes of soft foundation change including "exploration equipment, weather" and so on, and establishes a series of principles to optimize the stratigraphic boundary of soft foundation. Research conclusions: (1) According to the organic matter content, porosity ratio, natural water content and other indexes, the soft foundation between hills can be divided into seasonal soft soil and silty soft soil. (2) The comprehensive means of "drilling + static exploration" is adopted to survey. The depth of soft foundation should be determined by drilling, while static exploration is mainly used to determine the mechanical parameters such as the bearing capacity of soft foundation. (3) A series of methods to optimize the layer boundary of soft base, such as the principle of avoiding drawing ′lens′, the principle of maximizing the soft foundation of gully heart, and the principle of the most unfavorable soft foundation of steep slope, are established. (4) It is of guiding significance to improve the survey quality of soft foundation between hills in south China and reduce the change of soft foundation in the construction stage.
|
Received: 08 December 2021
|
|
|
|
|
[1] |
王祥.高速铁路软基处理前后指标分析和参数反演[J].铁道工程学报, 2018(12):15-19.Wang Xiang. Index Analysis and Parameter Inversion before and after Soft Soil Ground Treatment in High-speed Railway[J]. Journal of Railway Engineering Society,2018(12):15-19.
|
[2] |
白涛,邢金雪,唐捷,等.丘间谷地软弱地基的处治及应用[J]. 湖南交通科技,2013(4):33-35.Bai Tao, Xing Jinxue, Tang Jie, etc. Treatment and Application of Soft Foundation in Interhilly Valley Ground[J]. Hunan Communications Science and Technology,2013(4):33-35.
|
[3] |
王保林, 杨贵勇. 重钢铁路浸水软基高填方路堤设计分析[J]. 高速铁路技术,2015(1):56-59.Wang Baolin, Yang Guiyong. Analysis on Design of High Flood Embankment Constructed on Soft Ground of Chongqing Steel Company Railway[J]. High Speed Railway Technology, 2015(1):56-59.
|
[4] |
《工程地质手册》编委会.工程地质手册(第四版)[M].北京:中国建筑工业出版社,2007.Editorial Board of Handbook of Engineering Geology. Handbook of Engineering Geology (Fourth Edition)[M]. Beijing: China Architectural & Building Press, 2007.
|
[5] |
王瑞.静力触探在岩土工程勘察中的运用[J].山西建筑,2019(15):43-45.Wang Rui. Application of Static Contact in Geotechnical Engineering Investigation[J]. Shanxi Architecture, 2019(15):43-45.
|
[6] |
JTG D30—2004,公路路基设计规范[S].JTG D30—2004,Specifications for Design of Highway Subgrades[S].
|
|
|
|