The Geologic Features and Governance Measures for Kunming Rail Transit Line 4 |
ZHAO Fuyu, LIU Wei, ZHANG Xu, HE Jiangliang, YANG Wenhui |
Kunming Survey, Design and Research Institute Co. Ltd of CREEC, Kunming, Yunnan 650200, China |
|
|
Abstract Research purposes: The geological characteristics of the Kunming basin are various and the geological conditions are complex, which has a great influence on the construction of the rail transit engineering. Due to the limitation of the exploration area, the study on the geological characteristics of the area is limited to the point at present, while the comprehensive and comparative study on the geological characteristics of the Kunming basin is less. This paper studies the regional geological characteristics and main engineering geological problems of Kunming Rail Transit Line 4, and provides the basis for taking relevant engineering measures. Research conclusions: (1)Through the analysis of the geological conditions along Line 4, the differences of the geological characteristics and the main engineering geological problems of the micro-geomorphologic regions in the Kunming basin are systematically studied; (2)Combined with the engineering scheme and the main engineering geological problems, the stability of the site, construction scheme, retaining structure and drainage, karst and foundation treatment, anti-floating and anti-seepage of foundation pit are analyzed;(3)The paper is of great significance for understanding of the geological characteristics of the Kunming basin and can be used as a reference for the construction of the Kunming rail transit engineering.
|
Received: 08 December 2021
|
|
|
|
|
[1] |
徐智勇,王俊,王时平.井间电磁波CT在昆明地铁岩溶区地质勘察中的应用[J].CT理论与应用研究,2018(5):617-626.Xu Zhiyong, Wang Jun, Wang Shiping. Application of Cross-borehole Electromagnetic Computerized Tomography in Karst Detection along Kunming Subway[J]. Computerized Tomography Theory and Applications,2018(5):617-626.
|
[2] |
蔡晶晶,阎长虹,王宁,等. 高密度电法在地铁岩溶勘察中的应用[J].工程地质学报,2011(6):935-940.Cai Jingjing, Yan Changhong, Wang Ning,etc. Application of High-Density Resistivity Method to Karst Investigation of Metro Engineering[J]. Journal of Engineering Geology, 2011(6):935-940.
|
[3] |
赵福玉,刘伟.昆明轨道交通4号线岩土工程勘察报告[R].昆明:中铁二院昆明勘察设计研究院有限责任公司,2018.Zhao Fuyu,Liu Wei.Geotechnical Investigation Report of Kunming Rail Transit Line 4[R].Kunming:Kunming Survey,Design and Research Institute Co. Ltd of CREEC,2018.
|
[4] |
崔维秀,薛元,谯春丽.昆明枢纽泥炭土及泥炭质土地基处理[J].高速铁路技术,2013(2):5-8.Cui Weixiu, Xue Yuan, Qiao Chunli. Foundation Treatment on Peaty Soil and Peat Soil in the Area of Kunming Railway Hub[J]. High Speed Railway Technology,2013(2):5-8.
|
[5] |
姚建峰.岩溶处理方法及技巧分析[J].工程技术研究,2017(4):12-14.Yao Jianfeng.Analysis of Karst Treatment Methods and Techniques[J]. Journal of Engineering Technology Research.2017(4):12-14.
|
[6] |
刘伟,和佳良,杨文辉,等.昆明轨道交通3号线深基坑岩土工程勘察与评价[J].铁道工程学报,2012(10):106-110.Liu Wei, He Jialiang,Yang Wenhui, etc.Geotechnical Engineering Investigation for Deep Foundation Pit of Line 3 of Kunming Rail Transit and Its Evaluation[J].Journal of Railway Engineering Society, 2012(10):106-110.
|
[7] |
刘伟,赵福玉,彭都,等.昆明轨道交通4号线岩溶发育特征及治理措施[J].工程地质学报,2018(S1):202-207.Liu Wei, Zhao Fuyu, Peng Du, etc. Karst Characteristics and Governance Measures in Kunming Metro Line 4[J]. Journal of Engineering Geology, 2018(S1):202-207.
|
|
|
|