Journal of Railway Engineering Society  2022, Vol. 39 Issue (8): 71-74    DOI:
Main Line: Tunnel Engineering Current Issue | Archive | Adv Search |
Cause Analysis and Preventive Measures of Blind Drainage Pipe Clogging in Tunnel
CHANG Juyou1, LIU Xiang1, ZHANG Xinping1, YANG Xiangrong2, ZHAO Zhong3, YANG Wenji1
1. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China;
2. The Third Engineering Co. Ltd, China Railway Seventh Bureau Group, Xi'an, Shaanxi 710000, China;
3. Sichuan Baotieqiao Tunnel Engineering Testing Technology Co. Ltd , Chengdu, Sichuan 610030, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech