|
|
Research on the Intelligent Control Method of Subway Shield Construction Schedule and Investment |
DUAN Xiaochen1, ZHAO Chenguang1, LI Ming1, SHI Zhendong2 |
1. Shijiazhuang Tiedao University, Shijiazhuang, Hebei 050043, China; 2. China Railway Construction Kunlun Metro Investment and Construction Management Co. Ltd, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes: Shield construction is an important method in urban subway construction. Its construction schedule and investment control has very significant complex system characteristics, and is affected by the shield's own factors, construction conditions, construction organization and management, project content, technical standards, financing characteristics and other complex and changeable influencing factors, so there are many problems in the actual control process. In order to optimize the schedule and investment control system, this paper intends to conduct analysis modeling and demonstration. Research conclusions:(1) Through the processing and analysis of the historical data of the completed project, the construction progress and investment information database of the subway section is established. (2) Nonlinear intelligent methods such as PSO cluster analysis and BPNN can be used to effectively estimate the construction schedule and investment objectives of the shield. (3) The dynamic optimization control management of shield construction schedule and investment can be realized by establishing the model based on PDCA, early warning and other management methods. (4) The dynamic optimization control model is applied in the shield construction of the actual subway section to realize the intelligent and information management of the subway section. (5) The research results can provide a feasible plan for the schedule and investment control of shield construction in the subway section.
|
Received: 10 September 2021
|
|
|
|
|
[1] |
唐超,马全明,赵丽凤,等. 盾构施工监测预警系统研究与实践[J].都市快轨交通,2019(6):67-73.Tang Chao, Ma Quanming, Zhao Lifeng, etc. A Monitoring and Warning System for Shield Tunneling [J]. Urban Rapid Rail Transit,2019(6):67-73.
|
[2] |
李潇,胡志根,杨光, 等. 基于BN-PERT进度风险分析模型的地铁项目进度风险分析[J].城市轨道交通研究,2020(6):10-13.Li Xiao, Hu Zhigen, Yang Guang, etc. Schedule Risk Analysis Model of Subway Project Based on Fuzzy Probability BN-PERT [J]. Urban Mass Transit,2020(6):10-13.
|
[3] |
陈桂香,宋久乐,黄宏伟.改进关键链技术在隧道进度风险控制中的应用[J].地下空间与工程学报,2015(1):235-240.Chen Guixiang, Song Jiule, Huang Hongwei. Application of Improved Critical Chain in Metro Tunnel Scheduling Risk Control [J]. Chinese Journal of Underground Space and Engineering,2015(1):235-240.
|
[4] |
王文准.不同盾径造成的施工成本差异对盾构机项目投资决策的影响分析[J].工程造价管理,2020(5):63-67.Wang Wenzhun. Influence of Construction Cost Difference Caused by Different Shield Diameters on Investment Decision of Shield Machine Project [J]. Engineering Cost Management,2020(5):63-67.
|
[5] |
周浩,孙连勇,尹长凤, 等.地铁隧道土压平衡盾构技术经济指标分析[J].现代隧道技术,2018(S2):240-244.Zhou Hao, Sun Lianyong, Yin Changfeng, etc. Analysis of Technological and Economic Indicators of EPB Shield Tunnelling [J]. Modern Tunnelling Technology,2018(S2):240-244.
|
[6] |
张社荣,方鑫,和孙文.基于MIV-BP模型和AIC准则的盾构掘进参数优化研究[J].铁道标准设计,2019(8):95-101.Zhang Sherong, Fang Xin, He Sunwen. Research on Boring Parameters Optimization for Shield Based on MIV-BP Model and AIC Criterion [J]. Railway Standard Design,2019(8):95-101.
|
[7] |
郝用兴,刘玉洋,马子领, 等.基于DE-BP神经网络的盾构推进液压系统故障诊断[J].中国科技论文,2018(10):1142-1147.Hao Yongxing, Liu Yuyang, Ma Ziling, etc. Fault Diagnosis of a Thrust Hydraulic System of Shield Tunneling Machine Based on DE-BP Neural Network [J]. China Sciencepaper,2018(10):1142-1147.
|
[8] |
陶洋,顾伟红.基于因子分析和BP神经网络的地铁盾构施工成本风险分析[J].科学技术与工程,2018(14):256-262.Tao Yang, Gu Weihong. Cost Risk Analysis of Metro Shield Construction Based on Factor Analysis and BP Neural Network [J]. Science Technology and Engineering,2018(14):256-262.
|
|
|
|