Evaluation Method for TBM Adaptability of Extra Long Tunnels |
GUO Limin |
China Railway First Survey and Design Institute Group Co. Ltd, Xi'an, Shaanxi 710043, China |
|
|
Abstract Research purposes: Through the investigation of existing TBM construction cases at home and abroad, combined with the development of TBM equipment and the improvement of construction level in recent years, the measures taken by open TBM to deal with various adverse geological problems were analyzed and studied, and the adverse geological engineering measures of TBM to deal with extremely hard rock, rock burst, large deformation of soft rock, fault fracture zone, water inrush and auxiliary tunnel conditions and the adaptability of TBM were evaluated, and a quantitative evaluation method for TBM adaptability was proposed. Research conclusions: (1)Through the analysis of the case, the adaptability evaluation of TBM through extremely hard rock, rock burst, large deformation of soft rock, fault fracture zone, water and mud inflow and other adverse geology is obtained.(2)Combined with the investigation and analysis of the existing special tunnel auxiliary tunnel scheme, the auxiliary tunnel condition coefficient is proposed, and the auxiliary tunnel conditions are quantitatively evaluated.(3)The evaluation coefficients of TBM adaptability are quantified under various types of adverse geological conditions.(4)Combined with the auxiliary tunnel conditions and the adaptability of adverse geological TBM, the TBM selection principle is proposed, and the existing TBM tunnel project is evaluated, showing that the TBM selection principle has good applicability.(5)The research results can be applied to the adaptability evaluation of TBM construction method for super long tunnels in mountainous areas.
|
Received: 11 October 2023
|
|
|
|
|
[1] |
黄俊阁.高磨蚀性硬岩地段敞开式TBM掘进参数优化和适应性研究[J].水利水电技术, 2017(8):90-95.Huang Junge. Optimization and Study on Adaptability of Tunneling Parameter for Open-type TBM in Zone of High Abradable Hard Rock[J]. Water Resources and Hydropower Engineering, 2017(8):90-95.
|
[2] |
王朋.引汉济渭秦岭深埋特长隧洞高地应力与岩爆关系研究[D].成都:西南交通大学, 2014.Wang Peng. Study on the Relationship Between Ground Stress and Rock Burst on the Deep-buried Tunnel of Water Diverstion Project from the Han River to the Wei River[D]. Chengdu:Southwest Jiaotong University, 2014.
|
[3] |
杜立杰, 洪开荣, 王佳兴,等.深埋隧道TBM施工岩爆特征规律与防控技术[J].隧道建设(中英文), 2021(1):1-15.Du Lijie, Hong Kairong, Wang Jiaxing, etc. Rockburst Characteristics and Prevention and Control Technologies for Tunnel Boring Machine Construction of Deep-buried Tunnels[J]. Tunnel Construction, 2021(1):1-15.
|
[4] |
郭长宝,张永双,邓宏科,等.基于岩爆倾向性的高黎贡山深埋隧道岩爆预测研究[J].工程勘察,2011(10):8-13.Guo Changbao, Zhang Yongshuang, Deng Hongke, etc. Study on Rock Burst Prediction in the Deep-buried Tunnel at Gaoligong Mountain Based on theRock Proneness[J].Geotechnical Investigation & Surveying,2011(10):8-13.
|
[5] |
王栋.西康高铁秦岭越岭段主要工程地质问题与地质选线原则[J].工程技术,2021(3):212-215.Wang Dong. Main Engineering Geological Problems and Geological Route Selection Principles of Qinling Cross-ridge Section of Xikang High-speed Railway[J].Engineering Technology,2021(3):212-215.
|
[6] |
李伯昌.新疆EH输水工程双三Ⅳ标盾构选型设计[J].建筑机械化,2021(5):35-40.Li Bochang.Shield Selection and Design for the Bi Three Ⅳ of Xinjiang EH Water Transmission Project[J].Construction Mechanization,2021(5):35-40.
|
[7] |
张超.青海“引大济湟”工程TBM卡机段围岩大变形特性及扩挖洞室支护方案研究[D].成都:成都理工大学, 2012.Zhang Chao.Study on Large Deformation Characteristicsof Surrounding Rock in TBM Card Section of Qinghai "Yingdajihuang" Project and Support Scheme of Expansion Cavern[D]. Chengdu:Chengdu University of Technology, 2012.
|
[8] |
郭毅.引红济石工程TBM卡机原因分析及处理[J].陕西水利,2013(2):62-63.Guo Yi. Cause Analysis and Treatment of TBM Machine Jamming in Project from Hongyan River to Shitou River[J].Shaanxi Water Resources,2013(2):62-63.
|
|
|
|