Research on the Layout of EMU Supporting Facilities in Xi'an Railway Hub |
WANG Jun |
China Railway First Survey and Design Institute Group Co. Ltd, Xi'an, Shaanxi 710043, China |
|
|
Abstract Research purposes: Xi'an Railway Hub Planning (2016-2030) was first approved by the whole railway. At present, there are still some problems that EMU supporting facilities capacity is insufficient and imbalance. It is necessary to improve transportation efficiency, reduce cost and increase efficiency and promote high-quality railway development on the basis of the overall planning of the hub and in combination with the requirements of EMU repair system reform in recent years, comprehensively sort out the EMU supporting facilities in the hub, find out the possible problems in the future through capacity analysis, and put forward adjustment and optimization suggestions for the layout of EMU supporting facilities in the hub, so as to improve the utilization rate of supporting facilities and maximize the efficiency of transportation organization. Research conclusions: (1)The EMU maintenance facilities at Xi'an station need to be coordinated and utilized byrelevant EMU section in the hub, and storage facilities should be configured in conjunction with EMU operation. (2)Xi'anbei EMU depot and Xi'anbei EMU section undertake the EMU maintenance needs of other stations. On the basis of existing passenger train technical servicing equipment, Xi'an railway station will add EMU supporting facilities. Xi'andong EMU section will be expanded in a timely manner as needed in the long term. The new Xi'annan railway station needs to be built and equipped with a reserved EMU section.(3)The research result can provide a reference for optimizing layout in other railway hubs across the country.
|
Received: 11 October 2023
|
|
|
|
|
[1] |
李鹏斌. 西安铁路枢纽客运系统布局研究[J].铁道运输与经济,2017(10):56-60.Li Pengbin. Study on the Layout of Passenger Transport System in Xi'an Railway Hub[J]. Railway Transport and Economy,2017(10):55-60.
|
[2] |
黄树华. 西安铁路枢纽快速铁路客运环线规划方案研究[J].铁道运输与经济,2018(4):75-79.Huang Shuhua. A Research on Planning Schemes of Railway Hub Fast Railway Passenger Loop Line [J]. Railway Transport and Economy,2018(4):75-79.
|
[3] |
中华人民共和国国家发展和改革委员会.中长期铁路网规划(2016年)[Z].北京:中华人民共和国国家发展和改革委员会,2016.National Development and Reform Commission of the National Development and Reform Commission. Medium and Long-term Railway Network Planning (2016) [Z]. Beijing: National Development and Reform Commission of the National Development and Reform Commission, 2016.
|
[4] |
中铁第一勘察设计院集团有限公司.新建客运北环线西安动车段高级修补强工程[R].西安:中铁第一勘察设计院集团有限公司,2018.China Railway First Survey and Design Institute Group Co. Ltd. Advanced Repair and Strengthening Project for the Xi'an High Speed Railway Section of the New North Ring Line [R]. Xi'an: China Railway First Survey and Design Institute Group Co. Ltd, 2018.
|
[5] |
中铁第一勘察设计院集团有限公司.西安铁路枢纽规划(2016—2030年)[R].西安:中铁第一勘察设计院集团有限公司,2016.China Railway First Survey and Design Institute Group Co. Ltd. Xi'an Railway Hub Planning (2016-2030) [R]. Xi'an: China Railway First Survey and Design Institute Group Co. Ltd, 2016.
|
[6] |
中华人民共和国国家发展和改革委员会.关中城市群城际铁路网规划[Z].北京:中华人民共和国国家发展和改革委员会,2014.National Development and Reform Commission of thePeople's Republic of China. Planning of Inter-city Rail Network in Guanzhong Urban Agglomeration [Z]. Beijing: National Development and Reform Commission of the People's Republic of China, 2014.
|
[7] |
TB 10621—2014,高速铁路设计规范[S].TB 10621—2014,Code for Design of High Speed Railway[S].
|
[8] |
TB 10028—2016,铁路动车组设备设计规范[S].TB 10028—2016,Code for Design of Electric Multiple Unit Facility[S].
|
|
|
|