Research on the Settlement Regularity of Double-line Shield Tunnels Underneath Passing through Airport Runways

JIAO Xianyue, DONG Xiuzhu, LIN Senbin

Journal of Railway Engineering Society ›› 2024, Vol. 41 ›› Issue (2) : 68-73.

PDF(3082 KB)
PDF(3082 KB)
Journal of Railway Engineering Society ›› 2024, Vol. 41 ›› Issue (2) : 68-73.
Main Line: Tunnel Engineering

Research on the Settlement Regularity of Double-line Shield Tunnels Underneath Passing through Airport Runways

  • JIAO Xianyue, DONG Xiuzhu, LIN Senbin
Author information +
History +

Abstract

Research purposes: This paper relies on the project of the tunnel of Tianjin Metro Z2 underneath passing through the Binhai Airport,considering the airport non-stop flighting, analyzes the deformation of the runways of airport flight area caused by double-line shield tunnels undercrossing in the soft soil area, and explores the effects of shield burial depth and deep hole grouting circle thickness on the sedimentation of the runway, to obtain a suitable shield burial depth and deep hole grouting circle thickness,and analyzes its regularity on the sedimentation of the runway, providing guidance for the construction of double-line shield tunnels undercrossing non-stop airport runway in the soft soil area.
Research conclusions: (1) Increasing shield burial depth and deep hole grouting circle thickness can effectively reduce the settlement and the rate of difference settlement of the runway, but the reduction effect on the settlement does not become more effective with the increase of deep hole grouting circle thickness.(2) After the double-line tunnel excavation is completed, the horizontal settlement curve of the runways presents the "V" shape. Because of the stacking effect of double-line shield tunnels successive construction, the maximum settlement position is closer to the tunnel of the later excavation. (3) At the same buried depth, the influence of the tunnel of the later excavation on the settlement of the runway is less than the impact of the tunnel of the first excavation on it, and with the increase of the thickness of the grouting circle, the impact of the tunnel of the later excavation on the settlement of the runway is getting smaller and smaller.(4) During the double-line tunnel excavation, the rate of difference settlement of the runway increases, and then decreases, and finally stabilizes. (5)The research result provides a reference and construction guidance for the shield burial depth and deep-hole grouting design in the project of double-line shield tunnel undercrossing airport runways in the soft soil area.

Key words

soft soil / double-line shield tunnel / underneath pass through airport runways / non-stop flighting / deep hole grouting circle thickness / settlement regularity

Cite this article

Download Citations
JIAO Xianyue, DONG Xiuzhu, LIN Senbin. Research on the Settlement Regularity of Double-line Shield Tunnels Underneath Passing through Airport Runways[J]. Journal of Railway Engineering Society, 2024, 41(2): 68-73

References

[1] 戴志仁,王俊,胡瑞青. 城市轨道交通大直径盾构隧道若干关键技术[J].铁道工程学报,2021(6):75-81.
Dai Zhiren, Wang Jun, Hu Ruiqing.Key Technologies for the Application of Large Diameter Shield Tunnel in Urban Railway[J]. Journal of Railway Engineering Society,2021(6):75-81.
[2] 冯慧君,俞然刚.双线隧道盾构掘进对地表沉降影响的数值分析[J].铁道工程学报, 2019(3):78-83.
Feng Huijun, Yu Rangang.Numerical Analysis of Influence of Double-line Tunnel Shield Tunneling on Ground Surface Settlement[J]. Journal of Railway Engineering Society,2019(3):78-83.
[3] 逯兴邦,王元东,乔亚飞,等. 不停航条件下机场飞行区地下穿越施工工法研究[J]. 现代隧道技术,2018(S2): 375-385.
Lu Xingbang, Wang Yuandong, Qiao Yafei, etc. Investigation on Undercrossing Construction Methods Used in the Airfield Area under Non-suspending Condition[J].Modern Tunnelling Technology,2018(S2): 375-385.
[4] 谭忠盛,马栋,孙晓静,等. 不停航机场跑道下大断面隧道施工技术[J]. 土木工程学报,2015(S1): 378-382.
Tan Zhongsheng, Ma Dong, Sun Xiaojing, etc. Construction Technology of Large Span Tunnel under the Non-stop Flight Runway[J].China Civil Engineering Journal, 2015(S1): 378-382.
[5] 田家琳,李征,刘秀娟. 首都国际机场下穿滑行道长大箱涵顶进施工技术[J]. 铁道标准设计,2007(3): 51-53.
Tian Jialin, Li Zheng, Liu Xiujuan.Capital International Airport Underneath the Taxiway Long Box Culvert Jacking Construction Technology[J].Railway Standard Design,2007(3): 51-53.
[6] 高峰,付钢,胡文亮. 移动飞机荷载对机场下部隧道的影响[J]. 重庆交通大学学报:自然科学版,2012(2): 218-222.
Gao Feng, Fu Gang, Hu Wenliang.Influence of Moving Aircraft Loads on Airport Tunnel[J]. Journal of Chongqing Jiaotong University:Natural Science,2012(2): 218-222.
[7] MH/T5004—2010,民用机场水泥混凝土道面设计规范[S].
MH/T5004—2010,Specifications for Airport Cement Concrete Pavement Design[S].
[8] 滕振楠,田志宇,韦远飞,等. 停机坪下穿隧道结构荷载分析[J].西南公路,2016(4):73-76.
Teng Zhennan, Tian Zhiyu, Wei Yuanfei, etc. Structural Load Analysis of the Tunnel under the Apron[J]. Southwest Highway, 2016(4):73-76.