Numerical Simulation Calculation and Field Data Monitoring Analysis for Start Section of Shield Construction of Wuhan Metro |
DING Lie - yun,LI Wei - ming,CHEN Xiao - yang |
Huazhong University of Science and Technology,Wuhan,Hubei 430074,China |
|
|
Abstract Research purposes: Shield construction is one of the major methods for metro construction. The big difference exists in features between the start section and the standard section in shield construction,such as the reinforcement area in the end section. It is necessary to investigate the features of the numerical simulation and the field monitoring data to know the special laws that fit to the start section.
Research conclusions: The finite difference model was established on the base of the soil properties of Jiangji Section of Line 2 of Wuhan metro. The shield construction process of the start section was simulated by 6 steps. The vertical displacements after excavating 30 m of the right track were analyzed by sampling the different cross - section while the analysis was made for the difference between the numerical simulation result and the field monitored data about the start process to know the common points of them for providing the reference to the numerical calculation,engineering analysis and engineering prediction of the start section of shield construction.
|
Received: 15 January 2011
|
|
|
|
|
[1] 鲍永亮,郑七振,唐建忠. 上海软土地层盾构始发施工技术[J]. 铁道工程学报,2010( 3) : 118 - 122.
Bao Yongliang, Zheng Qizhen, Tang Jianzhong.Technology for Originating Construction of Shield Tunnel in Soft Soil Stratum in Shanghai[J]. Journal of Railway Engineering Society,2010( 3) : 118 - 122.
[2] 刘兵科. 盾构始发预留洞口模板体系的设计与施工[J].施工技术,2008( 9) : 100 - 102.
Liu Bingke. Design and Construction of Formwork System for Shield - driven Reservation Opening[J].Construction Technology,2008( 9) : 100 - 102.
[3] 靳世鹤. 南京长江隧道盾构始发井深基坑降水方案设计[J]. 现代隧道技术,2008( 3) : 46 - 49.
Jin Shihe. Dewatering Plan for a Deep Shield Launching Pit of Nanjing Yangtze River Tunnel[J].Modern Tunnelling Technology,2008( 3) : 46 - 49.
[4] 黄震江,林尚连. 盾构始发段管井降水土体加固技术[J]. 施工技术,2009( S1) : 273 - 275.
Huang Zhengjiang,Lin Shanglian. Soil Strengthening Technology with Tube Well Dewatering in Shield Beginning Segment[J]. Construction Technology,2009( S1) : 273 - 275.
[5] 赵宝虎,王燕群,岳澄,等. 盾构始发过程反力架应力监测与安全评价[J]. 工程力学,2009( 9) : 105 - 111.
Zhao Baohu,Wang Yanqun,Yue Cheng,etc. Stress Monitoring and Safety Evaluation of the Counterforce Frame During Shield Originating [J]. Engineering Mechanics,2009( 9) : 105 - 111.
[6] 袁大军,尹凡,王华伟,等. 超大直径泥水盾构掘进对土体的扰动研究[J]. 岩石力学与工程学报,2009 ( 10) :2074 - 2080.
Yuan Dajun,YinFan,Wang Huawei,etc. Study of Soil Disturbance Caused by Super - large Diameter Slurry Shield Tunnelling [J]. Chinese Journal of Rock Mechanics and Engineering,2009( 10) : 2074 - 2080.
[7] 刘兵科,石萌. 盾构250 m 半径曲线始发段管片姿态控制技术[J]. 建筑技术,2009( 11) : 970 - 972.
Liu Bingke,Shi Meng. State Control Technique of Shield 250 m Radius Curve Launching Segment Pipe [J]. Architecture Technology,2009( 11) : 970 - 972.
[8] 王源,刘松玉,谭跃虎,等. 南京长江隧道浦口深基坑信息化施工与分析[J]. 岩土工程学报,2009( 11) : 1784 -1791.
Wang Yuan,Liu Songyu,Tan Yuehu,etc. Analysis and Information Construction of Pukou Deep Foundation Pit of Nanjing Yangtze River Tunnel[J].Chinese Journal of Geotechnical Engineering,2009( 11) :1784 - 1791.
|
|
|
|